Summary
Implementation of the erosion and sediment pollution control plan - rock construction entrance, 3 each; implementation of the erosion and sediment pollution control plan - compost filter sock (32 dia. ) - 4,650 LF; implementation of the erosion and sediment pollution control plan - weighted sediment filter tube, 145 LF clearing and grubbing, 23.1 acre grading - grading area 1, 24,450 CY Grading - grading area 2, 141,209 CY grading - grading area 3, 13,626 CY Grading; ripping, 15.2 acre; planting - planting preparation 23.1 acre; planting - tree seedlings 10,345 each; planting - grass seed 240 lb; subsurface drain 1,990 LF; permanent channel excavation 208 CY; erosion matting 767 SY; selective grading, 200 acre; implementation of the traffic control plan, 1 LS.