Summary
The principal items of work and approximate quantities are: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance with Wash Rack; 4,650 LF Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32" Dia.); 4 LF Implementation of the Erosion and Sediment Pollution Control Plan - Weighted Sediment Filter Tube; 41.5 acre - Clearing and Grubbing; 401,000 CY Grading; 20 acre Grading - Hummocky Piles; 10.2 acre Grading - Ripping; 46 LF 12" Pipe Installation; 222 LF - 24" Pipe Installation; 422 LF - 30" Pipe Installation; 4,491 CY Channel Excavation - Permanent Channel Excavation; 11,223 SY Channel Lining - Erosion Matting; 1 invoice Gas Line Relocation; 41.5 acre Planting Preparation; 20,536 each Planting - Tree Seedlings; 1,113 lb. Planting - Grass Seed.