Summary
The principal items of work and approximate quantities are: 4 each rock construction entrance implementation of the erosion and sediment pollution control plan; 17,674 LF compost filter sock (32 diameter) implementation of the erosion and sediment pollution control plan; 89 SY riprap apron implementation of the erosion and sediment pollution control plan; 79.0 acre grading area 1 clearing and grubbing; 17.2 acre grading area 2 clearing and grubbing; 7.4 acre grading area 3 clearing and grubbing; 1.9 acre grading area 4 clearing and grubbing; 35.6 acre grading area 5 clearing and grubbing; 7.5 acre grading area 6 clearing and grubbing; 1,826 LF new road construction access road; 2,229 ton install 2" penndot 2a on all roads at end of project; 3,844 LF subsurface drain. See outside link.