Closed

AML - Summerlee AMD Treatment RFP

Description: Item 1.1 - Mobilization and Demobilization - per lump sum cannot be more than 5% of the TOTAL AMOUNT BID Item 2.1 - Construction Layout - per lump sum cannot be more than 3% of the TOTAL AMOUNT BID Item 3.1 - Quality Control - per lump sum cannot be more than 2% of the TOTAL AMOUNT BID Item 4.1 - Site Preparation - per lump sum cannot be more than 3% of the TOTAL AMOUNT BID Item 4.2 - Access Road Construction per ton Item 4.3 - Geotextile Fabric - Stabilization per square yard Item 5.1 - Stabilized Construction Entrance per ton Item 5.2 - Woven-Belted Silt Fence per linear foot Item 5.3 - Pumped Water Filter Bag per each Item 6.1 Revegetation per plan view acre Item 7.1 - Terraced Iron Formation Ditch Rehabilitation and Construction per lump sum Item 7.2 - No. 1 High Calcium Limestone per ton Item 8.1 - Existing AFVFPs Rehabilitation per lump sum Item 9.1 - Settling Pond Rehabilitation per lump sum Item 9.2 - Baffle Curtain per linear foot Item 10.1 - Unclassified Excavation per cubic yard Item 10.2 - AFVFP Control System per each Item 10.3 - Anti-Seep Collar per each Item 10.4 - Geotextile Fabric - Separation per square yard Item 10.5 - Geotextile Fabric - Subsurface Drainage per square yard Item 10.6 - Underdrain Pipe - 8 In. PVC per linear foot Item 10.7 - No. 57 Stone per ton Item 10..8 - Riprap Stone per ton Item 11.0 - Utilities-NO BID ITEM Addendum No 2 is issued to publish and distribute the attached information to the vendor community: 1. To publish vendor questions and answers and pre-bid conference sign-in sheets 2. To publish clarifications, notes, and changes 3. To publish revised plans No other changes.

Released
Oct 6, 2026
Closes
Nov 18, 2026(Closed)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts