Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Advanced Manufacturing Innovation Center St. Louis (ANICSTL)
Work includes construction of non-profit advanced manufacturing innovation hub that is 89,600 SF and will provide flexible spaces to accommodate special project needs, incubator spaces, offices, collaboration spaces, a multi-purpose space that will also serve as a maker space, see outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
State University of New York System Office
Provide design and construction administration services for the construct new quantum research and innovation hub project.
Posted Date
Nov 7, 2025
Due Date
Dec 3, 2025
Release: Nov 7, 2025
State University of New York System Office
Close: Dec 3, 2025
Provide design and construction administration services for the construct new quantum research and innovation hub project.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Joint Program Executive Office for Chemical, Biological, Radiological and Nuclear Defense
Innovation in biologics manufacturing: Biologics (e.g., antibody) compatible cell free production capability that can support pre-clinical testing and potentially produce 5-10k dose lots of GMP drug substance. Innovations in biologics manufacturing process control (e.g., digital twins). Technologies to reduce biologics drug substance/product release time and/or enable real-time release.
Posted Date
Oct 28, 2025
Due Date
Dec 22, 2025
Release: Oct 28, 2025
Joint Program Executive Office for Chemical, Biological, Radiological and Nuclear Defense
Close: Dec 22, 2025
Innovation in biologics manufacturing: Biologics (e.g., antibody) compatible cell free production capability that can support pre-clinical testing and potentially produce 5-10k dose lots of GMP drug substance. Innovations in biologics manufacturing process control (e.g., digital twins). Technologies to reduce biologics drug substance/product release time and/or enable real-time release.
AvailableIdaho Operations Office
Open source software: maximizing advanced manufacturing simulations with MALAMUTE.
Posted Date
Mar 15, 2024
Due Date
Mar 15, 2026
Release: Mar 15, 2024
Idaho Operations Office
Close: Mar 15, 2026
Open source software: maximizing advanced manufacturing simulations with MALAMUTE.
AvailableSuny Stony Brook University
The project will construct a new, approximately 100,000 GSF Quantum Research and Innovation Hub with purpose-built laboratories including vibration-isolated basements, clean rooms, cryogenic labs, electromagnetically shielded environments, a fiber optic backbone, and dedicated quantum data center and teaching spaces. Design services will proceed for the entire project with an estimated construction value of $160–$200 million, with final building size and site to be determined based on available budget.
Posted Date
-
Due Date
Dec 3, 2025
Suny Stony Brook University
Close: Dec 3, 2025
The project will construct a new, approximately 100,000 GSF Quantum Research and Innovation Hub with purpose-built laboratories including vibration-isolated basements, clean rooms, cryogenic labs, electromagnetically shielded environments, a fiber optic backbone, and dedicated quantum data center and teaching spaces. Design services will proceed for the entire project with an estimated construction value of $160–$200 million, with final building size and site to be determined based on available budget.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →