Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Fircrest
Improvement of approx. 700 LF of continuous traffic curb and gutter and sidewalk along the west side of Alameda Avenue between existing sidewalk end points at the Cypress Point driveway entrance, north to an existing curb ramp at the southwest corner of Emerson Street. Between the back of curb and sidewalk there will be a 5' wide planter area, consisting of 4' of landscaped area and 1' of choker course gravel. The sidewalk section will be installed as dense concrete over a ballast course that can accept surface runoff via the choker course and provide on-site infiltration. Existing driveways within the project limits will be replaced with dense concrete aprons and HMA driveway patches. Minor storm drain improvements within the roadway will be included as part of this project and all related work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Township of Spring
Work includes approx 395 SY of concrete sidewalk, including two (2) ADA ramps.
Posted Date
Nov 3, 2025
Due Date
Dec 12, 2025
Release: Nov 3, 2025
Township of Spring
Close: Dec 12, 2025
Work includes approx 395 SY of concrete sidewalk, including two (2) ADA ramps.
AvailableCity of Hattiesburg
Work consists of sidewalk, driveways, and curb and gutter.
Posted Date
Oct 26, 2025
Due Date
Dec 4, 2025
Release: Oct 26, 2025
City of Hattiesburg
Close: Dec 4, 2025
Work consists of sidewalk, driveways, and curb and gutter.
AvailableCity of Ventura
The City of Ventura seeks proposals for the Residential Street Sidewalk and HAWK Signal Project, which involves closing sidewalk gaps, installing a HAWK signal, and adding curb ramps to improve connectivity and reduce traffic emissions. The project is federally funded and requires compliance with environmental and federal-aid procedures.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
City of Ventura
Close: Dec 18, 2025
The City of Ventura seeks proposals for the Residential Street Sidewalk and HAWK Signal Project, which involves closing sidewalk gaps, installing a HAWK signal, and adding curb ramps to improve connectivity and reduce traffic emissions. The project is federally funded and requires compliance with environmental and federal-aid procedures.
AvailableJefferson Parish
Project consists of removal of pavement (roadway, sidewalk, etc.), removal of drainage construction of new asphalt roadway with base course and sub-base, construction of concrete curb and gutter, construction of under ground drains and catch basins, construction of box culvert and pavement striping.
Posted Date
Nov 5, 2025
Due Date
Dec 11, 2025
Release: Nov 5, 2025
Jefferson Parish
Close: Dec 11, 2025
Project consists of removal of pavement (roadway, sidewalk, etc.), removal of drainage construction of new asphalt roadway with base course and sub-base, construction of concrete curb and gutter, construction of under ground drains and catch basins, construction of box culvert and pavement striping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis