Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the replacement of a 6-inch water main and associated infrastructure on AL-181 from CR-34 to Stone Creek Dr. The project includes directionally drilling a 6" DIPS HDPE PE4710 DR11 water main, reconnecting service taps and main tie-ins, resetting fire hydrants, and grout-filling the existing main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
The project includes but is not limited to replacement of approx. 2,000 LF of existing 6" water main on W. 78th Avenue with new 6" water main from Hendricks Street to Taney Place. The work also includes replacement of valves, hydrants, and water services within the Right of Way.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
The project includes but is not limited to replacement of approx. 2,000 LF of existing 6" water main on W. 78th Avenue with new 6" water main from Hendricks Street to Taney Place. The work also includes replacement of valves, hydrants, and water services within the Right of Way.
AvailableReplacement of approx. 1,250 LF of 8", and 200 LF of 6" ductile iron pipe water main and appurtenances including gate valves, hydrants, tapping sleeves and valves, water services, and incidental work including paving and concrete walk replacement.
Posted Date
-
Due Date
Mar 19, 2026
Release: -
Close: Mar 19, 2026
Replacement of approx. 1,250 LF of 8", and 200 LF of 6" ductile iron pipe water main and appurtenances including gate valves, hydrants, tapping sleeves and valves, water services, and incidental work including paving and concrete walk replacement.
AvailableReplacement of approx. 652 LF of water main and all associated appurtenances.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Replacement of approx. 652 LF of water main and all associated appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →