Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Airport Roof Replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Port of Portland is soliciting bids for replacement and rehabilitation of the Central Utility Plant roof at Portland International Airport, including demolition of portions of the roof assembly, repair of wet roof areas, removal of catwalks and fall protection assemblies, and installation of flashing, electrical conduits, stairs, guardrails, and ballasted fall protection. The project will be awarded as a lump‑sum contract with an estimated value of approximately $1,500,000. Bids are due on Jan. 22, 2026 with a non‑mandatory pre‑bid meeting on Jan. 7, 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Port of Portland is soliciting bids for replacement and rehabilitation of the Central Utility Plant roof at Portland International Airport, including demolition of portions of the roof assembly, repair of wet roof areas, removal of catwalks and fall protection assemblies, and installation of flashing, electrical conduits, stairs, guardrails, and ballasted fall protection. The project will be awarded as a lump‑sum contract with an estimated value of approximately $1,500,000. Bids are due on Jan. 22, 2026 with a non‑mandatory pre‑bid meeting on Jan. 7, 2026.
AvailableRoof replacement.
Posted Date
Nov 26, 2025
Due Date
Dec 30, 2025
Release: Nov 26, 2025
Close: Dec 30, 2025
Roof replacement.
AvailableThe City of Healdsburg seeks informal bids to re-roof Hangar 610 and replace existing flat inlay light transmitting panels on several airport buildings at Healdsburg Municipal Airport. A mandatory pre-bid meeting is scheduled for January 15, 2026, at 3:00 p.m. The engineer’s estimate is $70,000, and bids are due by email on January 29, 2026, at 2:00 p.m. PT.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
The City of Healdsburg seeks informal bids to re-roof Hangar 610 and replace existing flat inlay light transmitting panels on several airport buildings at Healdsburg Municipal Airport. A mandatory pre-bid meeting is scheduled for January 15, 2026, at 3:00 p.m. The engineer’s estimate is $70,000, and bids are due by email on January 29, 2026, at 2:00 p.m. PT.
AvailableWork include roof repairs and replacement.
Posted Date
Aug 26, 2025
Due Date
Jan 13, 2026
Release: Aug 26, 2025
Close: Jan 13, 2026
Work include roof repairs and replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →