Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Port of Portland is soliciting bids for replacement and rehabilitation of the Central Utility Plant roof at Portland International Airport, including demolition of portions of the roof assembly, repair of wet roof areas, removal of catwalks and fall protection assemblies, and installation of flashing, electrical conduits, stairs, guardrails, and ballasted fall protection. The project will be awarded as a lump‑sum contract with an estimated value of approximately $1,500,000. Bids are due on Jan. 22, 2026 with a non‑mandatory pre‑bid meeting on Jan. 7, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide preventative maintenance, repairs, and cleaning services to the central utility plant (cup).
Posted Date
Nov 5, 2025
Due Date
Jan 16, 2026
Release: Nov 5, 2025
Close: Jan 16, 2026
Provide preventative maintenance, repairs, and cleaning services to the central utility plant (cup).
AvailableAirport Roof Replacement.
Posted Date
Dec 17, 2025
Due Date
Feb 12, 2026
Release: Dec 17, 2025
Close: Feb 12, 2026
Airport Roof Replacement.
AvailableCentral plant medical vacuum system replacement project - upgrading medical vacuum system in the hospital central utility plant. This work includes seismic anchoring, electrical, plumbing, and low voltage.
Posted Date
Nov 12, 2025
Due Date
Jan 6, 2026
Release: Nov 12, 2025
Close: Jan 6, 2026
Central plant medical vacuum system replacement project - upgrading medical vacuum system in the hospital central utility plant. This work includes seismic anchoring, electrical, plumbing, and low voltage.
AvailableSewage treatment plant roof replacement at generator building. Project will include the removal and replacement of the General Building upper and lower roofs at the Butterworth STP including the replacement of the tectum deck with steel deck.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Sewage treatment plant roof replacement at generator building. Project will include the removal and replacement of the General Building upper and lower roofs at the Butterworth STP including the replacement of the tectum deck with steel deck.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis