Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Airport- painting and flooring.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
For millwork, flooring, painting, gypsum assemblies.
Posted Date
Jan 4, 2026
Due Date
Jan 27, 2026
Release: Jan 4, 2026
Close: Jan 27, 2026
For millwork, flooring, painting, gypsum assemblies.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide bathroom remodel, painting, and flooring.
Posted Date
Dec 27, 2025
Due Date
Jan 13, 2026
Release: Dec 27, 2025
Close: Jan 13, 2026
Provide bathroom remodel, painting, and flooring.
AvailableComplete flooring replacement project, including the following: Removal and disposal of existing carpet and existing wood shoe mold. Floor preparation and patching as needed to ensure proper installation. Supply of all flooring materials, including Engineered hardwood flooring. Wood shoe mold. Any required underlayment, adhesives, and additional installation materials.
Posted Date
Nov 20, 2025
Due Date
Jan 7, 2026
Release: Nov 20, 2025
Close: Jan 7, 2026
Complete flooring replacement project, including the following: Removal and disposal of existing carpet and existing wood shoe mold. Floor preparation and patching as needed to ensure proper installation. Supply of all flooring materials, including Engineered hardwood flooring. Wood shoe mold. Any required underlayment, adhesives, and additional installation materials.
AvailableThis is an open Request for Quotation titled "RFQ 17-74 REBID Vehicle Exhaust Removal System" posted for the City of Somerville on the Massachusetts CommBuys portal for procurement of vehicle exhaust removal equipment. The posting lists an Available Date of 2017-07-19 and a Bid Opening Date of 2047-08-02, is marked OPEN, and no primary PDF/DOC/PPT attachment was found on the scraped posting.
Posted Date
Jul 19, 2017
Due Date
Aug 2, 2047
Release: Jul 19, 2017
Close: Aug 2, 2047
This is an open Request for Quotation titled "RFQ 17-74 REBID Vehicle Exhaust Removal System" posted for the City of Somerville on the Massachusetts CommBuys portal for procurement of vehicle exhaust removal equipment. The posting lists an Available Date of 2017-07-19 and a Bid Opening Date of 2047-08-02, is marked OPEN, and no primary PDF/DOC/PPT attachment was found on the scraped posting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →