Posted
Oct 9, 2026
Dec 7, 2026
Lillian Park Parking and Drainage Improvements Project RFP
Work includes construction of low impact development drainage improvements, concrete ribbon curb, asphalt parking lot, and pervious paver parking.
Description: This solicitation is for construction work to improve the airfield drainage system at the North Carolina Global Transpark – Kinston Regional Jetport. The scope includes roadway grading and excavation, pipe installation, seeding and mulching, and other civil siteworks as required, with contractors required to be prequalified by NCDOT for the applicable work codes. The project has a maximum construction time of 210 consecutive calendar days, includes liquidated damages of $2,000 per day, and a DBE participation goal of 0%.
SpecialDistrict · NC, US
Adjacent opportunities open for bidding right now.
Posted
Oct 9, 2026
Dec 7, 2026
Work includes construction of low impact development drainage improvements, concrete ribbon curb, asphalt parking lot, and pervious paver parking.
Cleveland County Water District
Special DistrictNC
Posted
-
Nov 25, 2026
Professional engineering services for design, bidding, and construction oversight of water system improvements, including an interconnection, water-line replacements, copper service connections, automated meters, and replacement of a river crossing line.
CitySC
Posted
Oct 16, 2026
Jan 28, 2027
The project t includes the complete installation of 580 LF of 24” HDPE drain line. Included in this installation is 5 catch basins along with aprons to accept the stormwater runoff from the roadway section. The connection to the existing catch basin shall be at the southerly side of the entrance to the existing commercial use. As installation of the drain line progresses, it will be necessary to remove the existing line. In the event that there is a conflict with existing sewer services the contactor shall replace the service affected. There will be one roadway patch of approximately 40’ in length. The contactor shall backfill the trench and install an asphalt patch of 8” stone base and 3” of asphalt surface. The contractor shall also install three (3) residential driveway patches, 6” stone base and 2” surface course, one commercial driveway 8” stone base and 3” asphalt surface course. The contractor shall ensure that the existing drain line has been totally removed, and that grass is in sown over the disturbed areas. The contractor shall minimize disturbance to the residential yards and ensure that the last 4” of the backfill be screened topsoil, without rocks or large clumps.
CityTX
Posted
Nov 10, 2026
Dec 16, 2026
The City of Schertz is accepting Request for Bids for construction services of the WENDY SWAN DRAINAGE IMPROVEMENTS, BID 2026-014 to install new culvert and channel as further detailed in the attached RFB
Solicitation files and supporting documents for this bid.