Special DistrictAR
Posted
Jun 1, 2026
Oct 21, 2026
Port of Little Rock Bank Repairs (RE-BID)
The project consists of: installation of geo-fabric and rip-rap for the maintenance and stabilization of the right descending bank from river mile 112. 7 to 112. 5 (site #1) and of the right descending bank at river mile 112. 3 (site #2). Site #1 repairs include 1,741 SY of ardot type 5 geotextile fabric 1,426 CY of riprap. Site #2 repairs include 1,387 SY of ardot type 5 geotextile fabric 3,288 CY of riprap.
