Summary
Provide dump site & clarifier drainage improvements. Dump site improvements - work includes constructing a 3' concrete trough, adding a new inlet point with a box structure, installing truck washdown stations, and expanding truck access with a new concrete driveway and concrete pad. The scope also includes regrading around the constructed roadway and restoring the impacted grass swale to support proper drainage and improve overall site functionality. Concrete swale and stormwater upgrades - the project includes installation of 8,729 LF of concrete swale to improve drainage around the site clarifier. Two new stormwater structures are proposed to tie into the existing stormwater network, enhancing water conveyance and overall stormwater system performance.