Commercial Street (8th Ave to 10th Ave) Stormsewer Improvements
Aug 14, 2026
Closes
Sep 29, 2026
Project will consist of mobilization 1 LS 54" concrete stormsewer (rcp) 754 LF concrete pavement (10" plain) (ae) (remove and replace) 763 SY curb and gutter (2'-6" combined) (ae) (remove and replace) 167 LF handicap ramp (remove and replace) 14.2 SY decorative brick inlay (remove and replace) 33 SY decorative retaining wall (remove and replace) 65 LF flowable fill 100 CY 8'x6' manhole - 9th ave location 1 ea 8'x10' manhole - 8th ave location 1 EA waterline (6") (c-900) (in place) 40 LF waterline (10") (c-900) (in place) 90 LF 6"x45 degree bend 4 EA 10"x45 degree bend 1 EA 6" gate valve with valve box 3 EA 10" gate valve with valve box 1 EA 10"x6" cross 1 EA 10"x10" cross 1 EA connection to existing storm sewer (12") 1 EA connection to existing storm sewer (15") 1 EA.