Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Hancock County Utility Authority
Hancock County Utility Authority seeks proposals for administrative services to support upgrades to a lift station in Bay St. Louis, MS. The scope includes compliance with state and federal regulations, project performance compliance, and administration of the Davis Bacon Act and Equal Opportunity requirements. The project is funded under the RESTORE Act.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Adair Village
Construction and installation of a generator set, ATS, panel board, associated wiring and electrical work, and protective fences at two separate existing wastewater lift station.
Posted Date
Nov 4, 2025
Due Date
Dec 2, 2025
Release: Nov 4, 2025
City of Adair Village
Close: Dec 2, 2025
Construction and installation of a generator set, ATS, panel board, associated wiring and electrical work, and protective fences at two separate existing wastewater lift station.
AvailableCity of Titusville
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
Posted Date
Nov 7, 2025
Due Date
Dec 9, 2025
Release: Nov 7, 2025
City of Titusville
Close: Dec 9, 2025
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
AvailableCity of Sturgeon
The City of Sturgeon, Missouri is soliciting bids to upgrade the existing lagoon lift station, including replacement of pumps, motors, controls, and related appurtenances, and to modify the force main and upgrade electrical service from single‑phase to three‑phase. Bid documents are distributed via the American Document Solutions (ADS) planroom.
Posted Date
-
Due Date
Nov 25, 2025
Release: -
City of Sturgeon
Close: Nov 25, 2025
The City of Sturgeon, Missouri is soliciting bids to upgrade the existing lagoon lift station, including replacement of pumps, motors, controls, and related appurtenances, and to modify the force main and upgrade electrical service from single‑phase to three‑phase. Bid documents are distributed via the American Document Solutions (ADS) planroom.
AvailableCity of Grants
Installation of two new lift station structure, force main and service line. The installation of both new lift stations also includes new duplex pump with new controls, piping, and check valves. Installation of a new 2", 4", and 8" force main and 4" service line via open trench. The 2" force main installation includes the connection to an existing force main within existing collection system. Service line installation includes the connection to the existing cleanout found on the west side of the building. The 8" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2. The 4" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2.
Posted Date
Nov 10, 2025
Due Date
Nov 25, 2025
Release: Nov 10, 2025
City of Grants
Close: Nov 25, 2025
Installation of two new lift station structure, force main and service line. The installation of both new lift stations also includes new duplex pump with new controls, piping, and check valves. Installation of a new 2", 4", and 8" force main and 4" service line via open trench. The 2" force main installation includes the connection to an existing force main within existing collection system. Service line installation includes the connection to the existing cleanout found on the west side of the building. The 8" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2. The 4" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis