Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Sturgeon
The City of Sturgeon, Missouri is soliciting bids to upgrade the existing lagoon lift station, including replacement of pumps, motors, controls, and related appurtenances, and to modify the force main and upgrade electrical service from single‑phase to three‑phase. Bid documents are distributed via the American Document Solutions (ADS) planroom.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Long Beach
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
Posted Date
Oct 22, 2025
Due Date
Nov 25, 2025
Release: Oct 22, 2025
City of Long Beach
Close: Nov 25, 2025
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
AvailableCity of San Marcos
Work includes rehabilitation of a lift station, including pump replacement, installation of Variable Frequency Drives (VFDs), electrical and instrumentation upgrades, wet well and valve vault rehabilitation, and installation of a new bypass pumping connection.
Posted Date
Oct 20, 2025
Due Date
Nov 20, 2025
Release: Oct 20, 2025
City of San Marcos
Close: Nov 20, 2025
Work includes rehabilitation of a lift station, including pump replacement, installation of Variable Frequency Drives (VFDs), electrical and instrumentation upgrades, wet well and valve vault rehabilitation, and installation of a new bypass pumping connection.
AvailableJacksonville Port Authority - Procurement
Provide materials, equipment, incidentals, testing, bypassing, and supervision necessary for the removal of all existing equipment, modifications, and upgrades to the terminal phase c lift station. Existing concrete slab over the wet well will be saw cut and retrofitted with a hinged locking aluminum access lid and frame capable of supporting pedestrian loads of 150psf minimum; sized appropriately for the rail system, access, removal, and service of the submersible pumps, wet well, and components. See attached file.
Posted Date
Apr 20, 2023
Due Date
Nov 24, 2025
Release: Apr 20, 2023
Jacksonville Port Authority - Procurement
Close: Nov 24, 2025
Provide materials, equipment, incidentals, testing, bypassing, and supervision necessary for the removal of all existing equipment, modifications, and upgrades to the terminal phase c lift station. Existing concrete slab over the wet well will be saw cut and retrofitted with a hinged locking aluminum access lid and frame capable of supporting pedestrian loads of 150psf minimum; sized appropriately for the rail system, access, removal, and service of the submersible pumps, wet well, and components. See attached file.
AvailableCity of Sturgeon
Project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools and supervision necessary to replace lift station pumps, controls, and other appurtenances as necessary, perform minor plumbing/piping revisions to the existing force main just outside the valve chamber, and coordinate with electric utility to upgrade the existing single phase electric service to 3-phase.
Posted Date
Nov 5, 2025
Due Date
Nov 25, 2025
Release: Nov 5, 2025
City of Sturgeon
Close: Nov 25, 2025
Project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools and supervision necessary to replace lift station pumps, controls, and other appurtenances as necessary, perform minor plumbing/piping revisions to the existing force main just outside the valve chamber, and coordinate with electric utility to upgrade the existing single phase electric service to 3-phase.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis