Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Adair Village
Construction and installation of a generator set, ATS, panel board, associated wiring and electrical work, and protective fences at two separate existing wastewater lift station.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Baudette
Project consists of main lift station emergency generator installation and lift station generator connection modifications. Contractor to include a stationary 50kw natural gas generator, transfer switch, all raceways, conductors, switches, receptacles, necessary hangars and supports, natural gas extension, service entrance modifications, and generator plug connection modifications at lift station locations as noted. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
City of Baudette
Close: Dec 4, 2025
Project consists of main lift station emergency generator installation and lift station generator connection modifications. Contractor to include a stationary 50kw natural gas generator, transfer switch, all raceways, conductors, switches, receptacles, necessary hangars and supports, natural gas extension, service entrance modifications, and generator plug connection modifications at lift station locations as noted. See outside link.
AvailableHancock County Utility Authority
Hancock County Utility Authority seeks proposals for administrative services to support upgrades to a lift station in Bay St. Louis, MS. The scope includes compliance with state and federal regulations, project performance compliance, and administration of the Davis Bacon Act and Equal Opportunity requirements. The project is funded under the RESTORE Act.
Posted Date
Nov 2, 2023
Due Date
Dec 18, 2025
Release: Nov 2, 2023
Hancock County Utility Authority
Close: Dec 18, 2025
Hancock County Utility Authority seeks proposals for administrative services to support upgrades to a lift station in Bay St. Louis, MS. The scope includes compliance with state and federal regulations, project performance compliance, and administration of the Davis Bacon Act and Equal Opportunity requirements. The project is funded under the RESTORE Act.
AvailableMassachusetts Department of Conservation and Recreation
Project consists of emergency repairs and replacement of generators, engines, and ancillary equipment as well as preventative maintenance of prime power and generators at various dcr state parks and recreation facilities.
Posted Date
Oct 29, 2025
Due Date
Dec 11, 2025
Release: Oct 29, 2025
Massachusetts Department of Conservation and Recreation
Close: Dec 11, 2025
Project consists of emergency repairs and replacement of generators, engines, and ancillary equipment as well as preventative maintenance of prime power and generators at various dcr state parks and recreation facilities.
AvailableCity of Terre Haute
The contract will consist of the following: Rehabilitation (lining) via Cured-in-Place Pipe (CIPP) of approx. 3,130 LF of 20" force main, and replacement, via open cut, of approx. 540 LF of 18" force main, and new construction of approx. 95 LF of 24" and 20 LF of 30" gravity sewers via open cut; replacement of the existing Park Avenue Lift Station, including bypass pumping, removal of existing lift station equipment and associated structures, installation of new structures, piping, pumping equipment and associated appurtenances, and site improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 2, 2025
Release: Nov 7, 2025
City of Terre Haute
Close: Dec 2, 2025
The contract will consist of the following: Rehabilitation (lining) via Cured-in-Place Pipe (CIPP) of approx. 3,130 LF of 20" force main, and replacement, via open cut, of approx. 540 LF of 18" force main, and new construction of approx. 95 LF of 24" and 20 LF of 30" gravity sewers via open cut; replacement of the existing Park Avenue Lift Station, including bypass pumping, removal of existing lift station equipment and associated structures, installation of new structures, piping, pumping equipment and associated appurtenances, and site improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis