Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work inlcudes 5,427 LF 12" hdpe pressure sewer forcemain, including trenching and backfilling; 11 EA double pressure cleanouts, incl. Hdpe pipe spools, fittings, installation, concrete collars; 2 EA 2" sewage combination air and vacuum valve station, incl. Earthwork, vault, piping and fittings, valves; 1,333 SY pavement removal and replacement; 1 LS nm 14 jack-and-bore crossing; 1 LS nm 599 jack-and-bore crossing; 60 CY rock excavation. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of line road lift station.
Posted Date
Jan 8, 2026
Due Date
Feb 11, 2026
Release: Jan 8, 2026
Close: Feb 11, 2026
Project consists of line road lift station.
AvailableWork includes replacing the existing sanitary sewer lift station, site work will include removal of existing package lift station, construction of a new submersible lift station, new gravity sewers, manholes and force main piping, paving, grading, seeding, and erosion control.
Posted Date
Jan 9, 2026
Due Date
Feb 25, 2026
Release: Jan 9, 2026
Close: Feb 25, 2026
Work includes replacing the existing sanitary sewer lift station, site work will include removal of existing package lift station, construction of a new submersible lift station, new gravity sewers, manholes and force main piping, paving, grading, seeding, and erosion control.
AvailableProject consists of the WWTP and lift station improvement project. See outside link.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
Project consists of the WWTP and lift station improvement project. See outside link.
AvailableRehabilitation of 6 existing sewer lift stations. Each lift station will include some combination of new pumps, new piping, wet well alteration or replacement, new valve vault, new combination air release valve and box, new or modified elevated control panel platform, new control panel, new telemetry subpanel and other associated appurtenances.
Posted Date
Jan 14, 2026
Due Date
Jan 29, 2026
Release: Jan 14, 2026
Close: Jan 29, 2026
Rehabilitation of 6 existing sewer lift stations. Each lift station will include some combination of new pumps, new piping, wet well alteration or replacement, new valve vault, new combination air release valve and box, new or modified elevated control panel platform, new control panel, new telemetry subpanel and other associated appurtenances.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →