Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The South Dakota Department of the Military is soliciting professional Architectural and/or Engineering (A&E) services to replace existing gas-fired hydronic boilers, pumps, drives, and associated equipment at the Sioux Falls Armory. The project has an estimated construction budget of $530,000 and requires site investigation, design development, and bidding services; interested firms must submit a Statement of Interest addressing project approach, team expertise, QA/QC, and relevant experience. The solicitation was published Jan 23, 2026 and is accepting responses through Feb 5, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace boilers.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
Replace boilers.
AvailableReplace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Posted Date
Oct 28, 2025
Due Date
Feb 27, 2026
Release: Oct 28, 2025
Close: Feb 27, 2026
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
AvailableReplace boilers & controls. Replace the original boilers and controls, provide delivery, startup and testing of specific identified boilers. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing.
Posted Date
Dec 10, 2025
Due Date
Feb 11, 2026
Release: Dec 10, 2025
Close: Feb 11, 2026
Replace boilers & controls. Replace the original boilers and controls, provide delivery, startup and testing of specific identified boilers. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing.
SUNY Polytechnic Institute (State University of New York) seeks bids to replace boilers in Donovan and Kunsela Halls at its Utica, NY campus. The work includes removal of existing boilers, installation of new boilers, and any necessary modifications, with all work to be completed within 270 calendar days after Notice to Proceed. Bidders must meet set-aside goals (11% MBE, 19% WBE, 6% SDVOB), pay a $40 deposit for bidding documents (waived for certified M/WBE and SDVOB), and the estimated contract value is $500,000–$1,500,000.
Posted Date
Jan 21, 2026
Due Date
Feb 20, 2026
Release: Jan 21, 2026
Close: Feb 20, 2026
SUNY Polytechnic Institute (State University of New York) seeks bids to replace boilers in Donovan and Kunsela Halls at its Utica, NY campus. The work includes removal of existing boilers, installation of new boilers, and any necessary modifications, with all work to be completed within 270 calendar days after Notice to Proceed. Bidders must meet set-aside goals (11% MBE, 19% WBE, 6% SDVOB), pay a $40 deposit for bidding documents (waived for certified M/WBE and SDVOB), and the estimated contract value is $500,000–$1,500,000.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis