Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace boilers & controls. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Posted Date
Oct 28, 2025
Due Date
Jan 21, 2026
Release: Oct 28, 2025
Close: Jan 21, 2026
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
AvailableProvide class b water testing. The contractor, upon request from the Facilities Manager or designee, who will serve as the Contracting Officer’s Representative (COR), shall collect water samples at the Federal Correctional Institution (FCI) and the Federal Prison Camp (FPC) in accordance with the Illinois Environmental Protection Agency (IEPA) testing requirements.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
Provide class b water testing. The contractor, upon request from the Facilities Manager or designee, who will serve as the Contracting Officer’s Representative (COR), shall collect water samples at the Federal Correctional Institution (FCI) and the Federal Prison Camp (FPC) in accordance with the Illinois Environmental Protection Agency (IEPA) testing requirements.
Replace high mast light #4. Replacing one (1) 100' Carolina or equivalent high mast pole including new cables, wires, and LED fixtures. The contractor will remove and dispose of the existing 100' pole and lighting fixture.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Replace high mast light #4. Replacing one (1) 100' Carolina or equivalent high mast pole including new cables, wires, and LED fixtures. The contractor will remove and dispose of the existing 100' pole and lighting fixture.
AvailableProvide 2nd QTR FY 26 subsistence. 1 LT.
Posted Date
Dec 2, 2025
Due Date
Dec 11, 2025
Release: Dec 2, 2025
Close: Dec 11, 2025
Provide 2nd QTR FY 26 subsistence. 1 LT.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis