Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 400 SY rumble resurfacing; 134,495 SY hot-mix asphalt surface removal, variable depth; 134,495 SY cold in-place recycling, 4.0"; 993 ton CIR full depth reclamation emulsified asphalt; 7 EA. Solar-powered flashing beacon assembly (complete); 182' grooving for recessed pavement marking 25"; 1,769' grooving for recessed pavement marking 13"; 182' modified urethane pavement marking - line 24"; 500' wood sign support; 212 sf sign panel - type 2; 431 sf sign panel - type 1; 1,011 ton incidental hot-mix asphalt surfacing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: -
Close: Jan 6, 2026
In place asphalt and cold milling.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 66 EA. Guardrail reflectors, type C (special); 174,503 SY hot-mix asphalt surface removal, variable depth; 174,503 SY cold in-place recycling, 4.0"; 1,289 ton CIR full depth reclamation emulsified asphalt; 30' grooving for recessed pavement marking 25"; 114' grooving for recessed pavement marking 13"; 153,845' modified urethane pavement marking - line 4"; 33.9 SF relocate sign panel - type 2; 64.5 SF relocate sign panel - type 1; 331.9 SF sign panel - type 1; 151 SF sign panel - type 2; 30 cal. Da changeable message sign; 30,205' short term pavement marking.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 66 EA. Guardrail reflectors, type C (special); 174,503 SY hot-mix asphalt surface removal, variable depth; 174,503 SY cold in-place recycling, 4.0"; 1,289 ton CIR full depth reclamation emulsified asphalt; 30' grooving for recessed pavement marking 25"; 114' grooving for recessed pavement marking 13"; 153,845' modified urethane pavement marking - line 4"; 33.9 SF relocate sign panel - type 2; 64.5 SF relocate sign panel - type 1; 331.9 SF sign panel - type 1; 151 SF sign panel - type 2; 30 cal. Da changeable message sign; 30,205' short term pavement marking.
AvailableWork includes 338 SY bridge deck scarification 3/4"; 338 SY bridge deck microsilica concrete overlay 2 1/2"; 65 SY approach slab repair (partial depth); 37 SY portland cement concrete surface removal 1 1/2"; 15' concrete curb repair; 75 SF structural repair of concrete (depth equal to or less than 5"); 5.5 CF polymer concrete; 84,896' modified urethane pavement marking - line 5"; 323 SY bridge deck grooving; 340 SY protective coat; 181 SY hot-mix asphalt base course widening, 9"; 634 SY preparation of base; 33,872' longitudinal joint sealant.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 338 SY bridge deck scarification 3/4"; 338 SY bridge deck microsilica concrete overlay 2 1/2"; 65 SY approach slab repair (partial depth); 37 SY portland cement concrete surface removal 1 1/2"; 15' concrete curb repair; 75 SF structural repair of concrete (depth equal to or less than 5"); 5.5 CF polymer concrete; 84,896' modified urethane pavement marking - line 5"; 323 SY bridge deck grooving; 340 SY protective coat; 181 SY hot-mix asphalt base course widening, 9"; 634 SY preparation of base; 33,872' longitudinal joint sealant.
AvailableRelease: Sep 30, 2025
Close: Jan 6, 2026
Playground at the community center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →