Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 66 EA. Guardrail reflectors, type C (special); 174,503 SY hot-mix asphalt surface removal, variable depth; 174,503 SY cold in-place recycling, 4.0"; 1,289 ton CIR full depth reclamation emulsified asphalt; 30' grooving for recessed pavement marking 25"; 114' grooving for recessed pavement marking 13"; 153,845' modified urethane pavement marking - line 4"; 33.9 SF relocate sign panel - type 2; 64.5 SF relocate sign panel - type 1; 331.9 SF sign panel - type 1; 151 SF sign panel - type 2; 30 cal. Da changeable message sign; 30,205' short term pavement marking.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Designed overlay, milling, and patching. Approx. 105,641 P polymerized bituminous materials (tack coat); 170 Ton incidental hot-mix asphalt surfacing; 9,224 ft saw cuts; 60 CAL DA changeable message sign; 102,191 ft short term pavement marking. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Designed overlay, milling, and patching. Approx. 105,641 P polymerized bituminous materials (tack coat); 170 Ton incidental hot-mix asphalt surfacing; 9,224 ft saw cuts; 60 CAL DA changeable message sign; 102,191 ft short term pavement marking. See outside link.
Available(1.08-Mi.) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. See outside link.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
(1.08-Mi.) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. See outside link.
IDOT is soliciting bids for a designed overlay, milling, and patching project from Emerson Road to Galt Road and the US 30 Connector in Whiteside County. The work includes milling, HMA surface and binder courses, patching, pavement markings, traffic control, and related items over approximately 4.29 miles on I-88/US 30 routes. Bids are due at the January 16, 2026 letting at 12:00 PM (CT).
Posted Date
Nov 25, 2025
Due Date
Jan 16, 2026
Release: Nov 25, 2025
Close: Jan 16, 2026
IDOT is soliciting bids for a designed overlay, milling, and patching project from Emerson Road to Galt Road and the US 30 Connector in Whiteside County. The work includes milling, HMA surface and binder courses, patching, pavement markings, traffic control, and related items over approximately 4.29 miles on I-88/US 30 routes. Bids are due at the January 16, 2026 letting at 12:00 PM (CT).
Work includes 2,217 ton hot-mix asphalt surface course, IL-9.5, mix "D", N50; 133 SY welded wire reinforcement; 133 SY class B patches, type IV, 9"; 20 EA. Dowel bars 1 1/4"; 400 SY class D patches, type ii, 18"; 66 EA. Tie bars 3/4"; 47 SF thermoplastic pavement marking - letters and symbols; 15,142' thermoplastic pavement marking - line 4"; 142' thermoplastic pavement marking - line 12"; 62' thermoplastic pavement marking - line 24"; 1,316' modified urethane pavement marking - line 4"; 44' modified urethane pavement marking - line 24"; 15,118' grooving for recessed pavement marking 5"; 62' grooving for recessed pavement marking 25".
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 2,217 ton hot-mix asphalt surface course, IL-9.5, mix "D", N50; 133 SY welded wire reinforcement; 133 SY class B patches, type IV, 9"; 20 EA. Dowel bars 1 1/4"; 400 SY class D patches, type ii, 18"; 66 EA. Tie bars 3/4"; 47 SF thermoplastic pavement marking - letters and symbols; 15,142' thermoplastic pavement marking - line 4"; 142' thermoplastic pavement marking - line 12"; 62' thermoplastic pavement marking - line 24"; 1,316' modified urethane pavement marking - line 4"; 44' modified urethane pavement marking - line 24"; 15,118' grooving for recessed pavement marking 5"; 62' grooving for recessed pavement marking 25".
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis