Work includes 175 sy TOPSOIL FURNISH AND PLACE, 4";
Illinois Department of Transportation
Work includes 330 SF storm sewers to be cleaned 12"; 23 SY portland cement concrete surface removal 2 1/4"; 1,425 SF combination curb and gutter removal and replacement greater than 10'; 628 SF thermoplastic pavement marking - line 24"; 56 SF thermoplastic pavement marking - line 12"; 1 EA. Relocate sign panel assembly - type a; 112 SF temporary pavement marking - line 12"- paint; 364 SY class D patches, type IV, 10"; 1,067 SY hot-mix asphalt removal over patches, 3 3/4"; 6,560 SY hot-mix asphalt surface removal, 2 1/4".
Illinois Department of Transportation
Work includes 2,514 SY aggregate subgrade improvement 12"; 19,315' longitudinal joint sealant; 323 SY hot-mix asphalt surface removal - butt joint; 53 SF portland cement concrete sidewalk 5"; 340 SY class d patches, type 1, 12"; 340 SY class d patches, type II, 12"; 2,518 SY hot-mix asphalt shoulders, 8"; 58' combination concrete curb and gutter, type B-6. 12; 108,260' temporary pavement marking - line 4"- paint; 150' storm sewers to be cleaned 12"; 100' combination curb and gutter removal and replacement less than or equal to 10'; 100' combination curb and gutter removal and replacement greater than 10'.
Illinois Department of Transportation
Work includes 13,713' longitudinal joint sealant; 218 SY hot-mix asphalt surface removal - butt joint; 86 ton hot-mix asphalt replacement over patches; 415 SY protective coat; 1,320 SF portland cement concrete sidewalk 5"; 380 SY hot-mix asphalt removal over patches, 4"; 5 SY class D patches, type I, 9"; 262 SY class D patches, type II, 9"; 40 SY class D patches, type III, 9"; 765 SF concrete median surface, 4"; 170' pipe culverts to be cleaned 12"; 500' pipe culverts to be cleaned 24"; 642' electric cable in conduit, signal no. 14 2C; 656' electric cable in conduit, signal no. 14 3C