Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Illinois Department of Transportation is soliciting bids for a 1.08-mile standard overlay and ADA improvements project on US 45 (Lake Street) from IL 176 (Maple Avenue) to Woodlawn Drive in the Village of Mundelein, Lake County. The work includes HMA surface removal and inlay, Class D full-depth patches, curb and gutter spot repairs, ADA curb ramp sidewalk replacement, drainage structure adjustments/cleaning, thermoplastic pavement markings, raised reflective pavement markers, accessible pedestrian signal improvements, and detector loops. The contract is set for the January 16, 2026 letting and specifies 60 working days.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
IDOT is soliciting bids for a 0.46-mile designed overlay on US 45 (Lake Street) in Libertyville, Lake County. Work includes HMA surface removal, depth patches, curb and gutter spot repairs, cold milling and inlay resurfacing, and new thermoplastic pavement markings. The project is in District 1, with bids due at the January 16, 2026 letting at 12:00 PM Central Time.
Posted Date
Nov 19, 2025
Due Date
Jan 16, 2026
Release: Nov 19, 2025
Close: Jan 16, 2026
IDOT is soliciting bids for a 0.46-mile designed overlay on US 45 (Lake Street) in Libertyville, Lake County. Work includes HMA surface removal, depth patches, curb and gutter spot repairs, cold milling and inlay resurfacing, and new thermoplastic pavement markings. The project is in District 1, with bids due at the January 16, 2026 letting at 12:00 PM Central Time.
AvailableIDOT District 7 is soliciting bids for 0.5 miles of parking and ADA improvements along IL 128 in Cowden, Shelby County, from 0.1 miles north of Elm Street to Christy Street. The work includes ADA curb ramps, sidewalk and curb/gutter work, HMA surface removal and replacement, thermoplastic pavement markings, and related items, with a contract time of 45 working days. This is an active highway construction letting, not a grant program, with the letting due on January 16, 2026 at 12:00 PM CT.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Release: Dec 5, 2025
Close: Jan 16, 2026
IDOT District 7 is soliciting bids for 0.5 miles of parking and ADA improvements along IL 128 in Cowden, Shelby County, from 0.1 miles north of Elm Street to Christy Street. The work includes ADA curb ramps, sidewalk and curb/gutter work, HMA surface removal and replacement, thermoplastic pavement markings, and related items, with a contract time of 45 working days. This is an active highway construction letting, not a grant program, with the letting due on January 16, 2026 at 12:00 PM CT.
IDOT is soliciting bids for a standard overlay and ADA curb ramp improvement on IL-1 (Halsted Street) from south of Ridge Road to Strieff Lane in the Villages of Homewood and Glenwood, Cook County. Work includes asphalt surface removal, hot-mix asphalt binder and surface courses, pedestrian ramp improvements, pavement patching, pavement markings, and associated traffic signal/APS and drainage adjustments. The contract is 35 working days, previously advertised in November 2025, and will be let on January 16, 2026 at 12:00 PM CT.
Posted Date
Nov 19, 2025
Due Date
Jan 16, 2026
Release: Nov 19, 2025
Close: Jan 16, 2026
IDOT is soliciting bids for a standard overlay and ADA curb ramp improvement on IL-1 (Halsted Street) from south of Ridge Road to Strieff Lane in the Villages of Homewood and Glenwood, Cook County. Work includes asphalt surface removal, hot-mix asphalt binder and surface courses, pedestrian ramp improvements, pavement patching, pavement markings, and associated traffic signal/APS and drainage adjustments. The contract is 35 working days, previously advertised in November 2025, and will be let on January 16, 2026 at 12:00 PM CT.
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.