Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
IDOT is soliciting bids for a standard overlay and ADA curb ramp improvement on IL-1 (Halsted Street) from south of Ridge Road to Strieff Lane in the Villages of Homewood and Glenwood, Cook County. Work includes asphalt surface removal, hot-mix asphalt binder and surface courses, pedestrian ramp improvements, pavement patching, pavement markings, and associated traffic signal/APS and drainage adjustments. The contract is 35 working days, previously advertised in November 2025, and will be let on January 16, 2026 at 12:00 PM CT.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes ada curb ramp installation.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Work includes ada curb ramp installation.
AvailableIllinois Department of Transportation is soliciting bids for a 1.08-mile standard overlay and ADA improvements project on US 45 (Lake Street) from IL 176 (Maple Avenue) to Woodlawn Drive in the Village of Mundelein, Lake County. The work includes HMA surface removal and inlay, Class D full-depth patches, curb and gutter spot repairs, ADA curb ramp sidewalk replacement, drainage structure adjustments/cleaning, thermoplastic pavement markings, raised reflective pavement markers, accessible pedestrian signal improvements, and detector loops. The contract is set for the January 16, 2026 letting and specifies 60 working days.
Posted Date
Nov 7, 2025
Due Date
Jan 16, 2026
Release: Nov 7, 2025
Close: Jan 16, 2026
Illinois Department of Transportation is soliciting bids for a 1.08-mile standard overlay and ADA improvements project on US 45 (Lake Street) from IL 176 (Maple Avenue) to Woodlawn Drive in the Village of Mundelein, Lake County. The work includes HMA surface removal and inlay, Class D full-depth patches, curb and gutter spot repairs, ADA curb ramp sidewalk replacement, drainage structure adjustments/cleaning, thermoplastic pavement markings, raised reflective pavement markers, accessible pedestrian signal improvements, and detector loops. The contract is set for the January 16, 2026 letting and specifies 60 working days.
AvailableThe City of Temecula is soliciting electronic bids for ADA Transition Plan Implementation - ADA Curb Ramp Replacement Phase I to remove and replace concrete ADA access ramps at various locations, including required traffic control, survey, and water quality compliance. Bids must be submitted electronically in PDF format through the City’s online bid system by 09:59:59 AM (PST) on January 12, 2026. HigherGov indicates the original posting is on the City’s PlanetBids portal and that solicitation documents are not hosted on HigherGov.
Posted Date
-
Due Date
Jan 12, 2026
Close: Jan 12, 2026
The City of Temecula is soliciting electronic bids for ADA Transition Plan Implementation - ADA Curb Ramp Replacement Phase I to remove and replace concrete ADA access ramps at various locations, including required traffic control, survey, and water quality compliance. Bids must be submitted electronically in PDF format through the City’s online bid system by 09:59:59 AM (PST) on January 12, 2026. HigherGov indicates the original posting is on the City’s PlanetBids portal and that solicitation documents are not hosted on HigherGov.
IDOT Region 5, District 9 is soliciting bids for 6.8 miles of resurfacing and ADA ramp improvements along US 51 in Perry County, from 0.2 miles north of IL 154 to Raven Road. The contract duration is 50 working days and is part of the January 16, 2026 letting scheduled for 12:00 PM. Plans and Special Provisions have not yet been posted; the project was previously advertised on November 7, 2025.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
IDOT Region 5, District 9 is soliciting bids for 6.8 miles of resurfacing and ADA ramp improvements along US 51 in Perry County, from 0.2 miles north of IL 154 to Raven Road. The contract duration is 50 working days and is part of the January 16, 2026 letting scheduled for 12:00 PM. Plans and Special Provisions have not yet been posted; the project was previously advertised on November 7, 2025.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis