San Francisco Public Utilities Commission
Special DistrictCA
Posted
Nov 17, 2026
Dec 17, 2026
WD-2946 Sunset Supply Pipeline Erosion Repair at San Mateo Creek RFP
Construction contract to repair erosion around the Sunset Supply Pipeline at San Mateo Creek by installing soldier beams and lagging concrete retaining walls along the creek bank. The scope includes placement of engineered backfill, installation of bioengineered creek embankment restoration, and improvements to an existing access road along the pipeline. Work will be performed in San Mateo County, California with an estimated construction cost of $2,700,000–$3,000,000 and includes Local Business Enterprise subcontracting requirements.
