Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes Pcc Pavement Widening / Pcc Resurfacing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 20 EA. lighting poles; 7,700 LF electrical circuits; 38,422 CY topsoil, strip, salvage and spread; 8,731 SY paved shoulder, P.C concrete 11.5"; 62,109 LF subdrain, longitudinal (shoulder) 4" dia.; 25,398 LF high tension cable guardrail; 1,586.620 STA grooves cut for pavement markings; 1,183.330 STA diamond ground shoulder rumble strips, PCC surface; 20 LF culvert, concrete roadway pipe, 24" dia.; 62,109.2 LF subdrain, longitudinal (shoulder) 4" dia.; 496.6 SY paved shoulder, P.C concrete 8".
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work includes 20 EA. lighting poles; 7,700 LF electrical circuits; 38,422 CY topsoil, strip, salvage and spread; 8,731 SY paved shoulder, P.C concrete 11.5"; 62,109 LF subdrain, longitudinal (shoulder) 4" dia.; 25,398 LF high tension cable guardrail; 1,586.620 STA grooves cut for pavement markings; 1,183.330 STA diamond ground shoulder rumble strips, PCC surface; 20 LF culvert, concrete roadway pipe, 24" dia.; 62,109.2 LF subdrain, longitudinal (shoulder) 4" dia.; 496.6 SY paved shoulder, P.C concrete 8".
AvailableWork includes 113,719.9 SY standard or slip-form portland cement concrete pavement, QM-c, class 3 durability, 10"; 125,070.240 EA.. Payment adjustment incentive/disincentive for pcc pavement thickness (by schedule); 8 EA. Rumble strip panel (PCC surface); 3,570 sy detour pavement; 252.3 ton surfacing, driveway, class a crushed stone; 3,829. 280 CY excavation, class 20, for roadway pipe culvert; 22 ea. Aprons, concrete, 24" Dia.; 726 LF culvert, concrete roadway pipe, 24" Dia. ; 168 LF culvert, concrete roadway pipe, 36" Dia.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work includes 113,719.9 SY standard or slip-form portland cement concrete pavement, QM-c, class 3 durability, 10"; 125,070.240 EA.. Payment adjustment incentive/disincentive for pcc pavement thickness (by schedule); 8 EA. Rumble strip panel (PCC surface); 3,570 sy detour pavement; 252.3 ton surfacing, driveway, class a crushed stone; 3,829. 280 CY excavation, class 20, for roadway pipe culvert; 22 ea. Aprons, concrete, 24" Dia.; 726 LF culvert, concrete roadway pipe, 24" Dia. ; 168 LF culvert, concrete roadway pipe, 36" Dia.
AvailableWork includes 14,239 ton base widening, hot mix asphalt mixture; 192,751 SY pavement scarification, nominal thickness; 25,667 ton hot mix asphalt standard traffic, intermediate course, 1/2" Mix; 3,241 ton asphalt binder, PG 58-28S, standard traffic; 2 EA. Rumble strip panel (HMA surface); 741.720 STA grooves cut for pavement markings; 13,796 ton granular shoulders, type A; 738.7 STA milled shoulder rumble strips HMA surface.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Work includes 14,239 ton base widening, hot mix asphalt mixture; 192,751 SY pavement scarification, nominal thickness; 25,667 ton hot mix asphalt standard traffic, intermediate course, 1/2" Mix; 3,241 ton asphalt binder, PG 58-28S, standard traffic; 2 EA. Rumble strip panel (HMA surface); 741.720 STA grooves cut for pavement markings; 13,796 ton granular shoulders, type A; 738.7 STA milled shoulder rumble strips HMA surface.
AvailableThe Georgia Department of Transportation (GDOT) is soliciting bids from pre-qualified contractors for PCC (Portland Cement Concrete) slab replacement services on SR 404/I-16 in Candler County (milepost 94.01 to 110.99). Work includes slab removal and replacement, traffic control, and temporary/permanent striping; contractors must be prequalified under GDOT’s Maintenance Master Services Agreement (MMSA) and provide performance/payment bonds. The solicitation was posted Dec 23, 2025 and has a response deadline of Jan 28, 2026; it is an RFQ/ITB for services (not a grant) and is open as of 2025-12-24.
Posted Date
Dec 23, 2025
Due Date
Jan 28, 2026
Release: Dec 23, 2025
Close: Jan 28, 2026
The Georgia Department of Transportation (GDOT) is soliciting bids from pre-qualified contractors for PCC (Portland Cement Concrete) slab replacement services on SR 404/I-16 in Candler County (milepost 94.01 to 110.99). Work includes slab removal and replacement, traffic control, and temporary/permanent striping; contractors must be prequalified under GDOT’s Maintenance Master Services Agreement (MMSA) and provide performance/payment bonds. The solicitation was posted Dec 23, 2025 and has a response deadline of Jan 28, 2026; it is an RFQ/ITB for services (not a grant) and is open as of 2025-12-24.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →