Special DistrictTX
Posted
Aug 19, 2026
Oct 1, 2026
72nd, 73rd, 74th, 75th, and Texas Street Sidewalk Improvements
Work inlcudes reconstructing 6-ft (typical) sidewalks and ada-compliant wheelchair ramps, concrete leveling, and tree protection, which comprises of matching existing sidewalk widths at trees or installing a slip-resistant galvanized steel plate over the roots and select ditches, minor striping works, coarse sand under sod, adjusting water meters, and other minor utility work.