Summary
The City of Fort Wayne City Utilities department is seeking contractors for the removal and replacement of the concrete roof slab above the west train settling tank at TRFP Plant 1, including demolition of miscellaneous piping, covered walkway, and related façade repairs. The scope also includes baffle wall repairs in the west train settling tank, replacement of access hatches, fixed ladder rungs, railings, grating, and miscellaneous metals, provision of davit crane bases, and concrete rehabilitation at Plant 1 west train and the east clarifier area. Bidding is conducted online via QuestCDN, with a pre-bid conference held on June 1, 2026, and bid closing on June 11, 2026.