FederalCA
Aug 12, 2026
Closes
Aug 24, 2026
Request for Information. Guldmann G3H+ Ceiling Patient Lifts. Unrestricted/open market. Brand Name or Equal.
Guldmann Ceiling Patient Lifts (Gh3+), Brand Name or Equal.
Description: The Department of Veterans Affairs is seeking 25 ceiling-mounted patient lifts for the Southern Arizona VA Healthcare System in Tucson, Arizona, including associated slings and stamped shop drawings. The work includes installation of 25 lift systems in 15 rooms, removal and disposal of 15 existing systems, compliance with specified safety standards, and delivery within 180 days after receipt of order. Quotes must be submitted electronically to the Contract Specialist by 12:00 P.M. Pacific Time on August 31, 2026, and will be evaluated using comparative evaluation procedures.
Federal · AZ, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalCA
Aug 12, 2026
Closes
Aug 24, 2026
Guldmann Ceiling Patient Lifts (Gh3+), Brand Name or Equal.
Jul 20, 2026
Closes
Aug 21, 2026
Requirement to replace and add additional ceiling mounted patient lifts. This work will include removal and replacement of some existing lift systems and new installations in areas defined below. Removal of existing lift equipment will be accomplished by the contractor, and materials will be returned to the VA for proper disposal.
Jul 20, 2026
Closes
Aug 21, 2026
Requirement to replace and add additional ceiling mounted patient lifts. This work will include removal and replacement of some existing lift systems and new installations in areas defined below. Removal of existing lift equipment will be accomplished by the contractor, and materials will be returned to the VA for proper disposal.
Special DistrictNJ
Mar 19, 2026
Closes
Aug 26, 2026
Work includes 3 EA of led lighting set, ul approved for skylift platform extension19. 2", 2 led fixtures, brackets and cable set, 110-220v wayne new 3 lifts; 3 EA of set chemical anchors and shims for skylift wayne new 3 lifts; 3 EA of stertil-guard anti-skid, applied at the factory for longer platforms lengths from 10 mtr. / 33' and longer wayne new 3 lifts.
Procurement and program contacts connected to 262-Network Contract Office 22 (36C262).