Southwest Independent School District
School DistrictTX
Posted
Jul 20, 2025
May 31, 2030
Physical Therapy Services - (RFP)
Provide physical therapy services.
Description: Item: SciFit Pro (Qty 3): Essential/significant physical, functional, or performance characteristics. Total Body Exerciser, Adjustable Cranks Bariatric seat; Ability to use hands and feet; 110V if applicable; Dimensions: 61" x 62" x 30". Item: Cable Machine (Qty 1): Essential/significant physical, functional, or performance characteristics. Cable machine; 10 lb increments; Different exercise modalities. See attached file.
Federal · TN, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from 249-Network Contract Office 9 (36C249).
These related opportunities are still open for bidding.
Southwest Independent School District
School DistrictTX
Posted
Jul 20, 2025
May 31, 2030
Provide physical therapy services.
CityFL
Posted
Sep 16, 2026
Oct 20, 2026
The City of Palm Coast is soliciting bids under an open ITB for upgrades to Water Treatment Plant No. 3, increasing treatment capacity from 3.0 MGD to 4.5 MGD. The work includes new reverse osmosis treatment skids, cartridge filters, pumps, chemical feed systems, replacement membranes, and associated piping, controls, electrical, and site work. This is a construction solicitation, not a grant program, and submissions are due October 20, 2026, at 2:00 PM EDT.
CityBC
Posted
Sep 16, 2026
Oct 13, 2026
The City of Victoria is seeking proposals from qualified consulting firms for a feasibility and options study concerning the planned upgrade of the heating, ventilation, and air conditioning systems at Victoria City Hall. This is a consulting-services procurement rather than a grant program. The solicitation is listed as open and closes on October 13, 2026, at 4:00 PM PDT.
Raleigh Durham Airport Authority
Special DistrictNC
Posted
Sep 17, 2026
Nov 4, 2026
Installation of Solar PV system on existing covered walkway canopy, installation of BESS system, installation of 100 Level 1 EV chargers. Work includes installation of all necessary electrical infrastructure to support these installations as well as coordination with Duke Power for interconnection.