Architecture: a. Removal of existing doors, louver frames and framing hardware. b. Repairs to termite damage wood sheathing and wood trim. c. Removal of existing louvers and openings. d. Weatherproofing at doors and hardware and necessary caulking for repainting. e. Installation of new steel doors and frames. f. Installation of new louvers g. Plaster repair after installation of new doors and louvers h. Treatment of interior concrete floor. i. Painting and finishing of exterior and interior items. Mechanical: a. Removal of all existing equipment and piping. b. Installation of new liquid chillers c. Installation of new air-cooled condenser d. Installation of new chilled water pumps e. Installation of new chilled water and refrigerant piping f. Installation of new expansion tank, air separator and chemical pot feeder. g. Installation of new duct attenuators and associated ductwork h. Other miscellaneous associated equipment. Electrical: a. Removal of existing electrical feeders, controllers, disconnects and branch circuits. b. Removal of existing luminaires c. Installation of new electrical feeders, controllers, disconnects and branch circuits. d. Installation of new luminaires. e. Installation of new telecommunications pathway for connection to new f. HVAC DDC control system panel.