Massachusetts Department of Transportation
State AgencyMA
Posted
Aug 24, 2026
Nov 3, 2026
612193 - Andover - Bridge Preservation
Bridge preservation.
Description: MassDOT is soliciting bids for bridge preservation on I-93 over the Merrimack River in Andover, Massachusetts, under FAP No. HIP(NGB)-0934(003) and project 612193. The procurement covers bridge construction and repair and has an estimated value of $105,213,000. Bids are due November 3, 2026, at 2:00 p.m. Eastern.
StateAgency · MA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Massachusetts Department of Transportation
State AgencyMA
Posted
Aug 24, 2026
Nov 3, 2026
Bridge preservation.
Pennsylvania Department of Transportation
State AgencyPA
Posted
Sep 17, 2026
Oct 22, 2026
Includes concrete deck repairs, diamond grinding, epoxy overlay, beam end repairs, and substructure repairs. Traffic will be maintained through short-term lane closures on the structure & daytime flagging underneath structure
CityNH
Posted
Sep 28, 2026
Oct 21, 2026
Replacing the existing 58' long, single-span bridge. The existing bridge consists of steel stringer superstructure with reinforced concrete deck supported on concrete faced stone masonry abutments. The work includes replacing the existing bridge with a 110' long steel girder bridge with concrete deck superstructure supported on semi-integral abutments. The replacement bridge will have an out-to-out deck width of 32' carrying two 12' wide travel lanes and a 5' sidewalk. Traffic will be maintained during construction on a temporary bridge constructed immediately downstream of the existing bridge. Roadway approach reconstruction limits are approx. 745'.
Massachusetts Department of Transportation
State AgencyMA
Posted
Sep 21, 2026
Oct 27, 2026
Decision makers connected to this RFP from Massachusetts Highway Division.