Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
6" portable bypass pump.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consist of bypass pump preventative maintenance, repair and replacement.
Posted Date
Jan 8, 2026
Due Date
Feb 9, 2026
Release: Jan 8, 2026
Close: Feb 9, 2026
Work consist of bypass pump preventative maintenance, repair and replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 120 LF pavement sawing; 40 SY 4" asphaltic concrete; 40 SY concrete base; 150 LF pump power cable; 2 EA furnish and install submersible pump; 15 LF 6"/8" dia. Ductile iron discharge pipe; 2 EA 6"/8" dia. Ductile iron tee w/ blind flange; 40 LF 6" dia. Ductile iron discharge pipe (horizontal).
Posted Date
Jan 28, 2026
Due Date
Feb 11, 2026
Release: Jan 28, 2026
Close: Feb 11, 2026
Work includes 120 LF pavement sawing; 40 SY 4" asphaltic concrete; 40 SY concrete base; 150 LF pump power cable; 2 EA furnish and install submersible pump; 15 LF 6"/8" dia. Ductile iron discharge pipe; 2 EA 6"/8" dia. Ductile iron tee w/ blind flange; 40 LF 6" dia. Ductile iron discharge pipe (horizontal).
AvailableInstallation of new wet well, three (3) new manholes, approximately 70 LF of 18" gravity sewer, approx 60 LF of 24" gravity sewer, new VFD’s and a new magnetic meter. Additionally, the project includes re-piping the existing valve vault, reconnection to the existing force main, replacement of pumps, bypass pumping and all other work
Posted Date
Dec 23, 2025
Due Date
Feb 5, 2026
Release: Dec 23, 2025
Close: Feb 5, 2026
Installation of new wet well, three (3) new manholes, approximately 70 LF of 18" gravity sewer, approx 60 LF of 24" gravity sewer, new VFD’s and a new magnetic meter. Additionally, the project includes re-piping the existing valve vault, reconnection to the existing force main, replacement of pumps, bypass pumping and all other work
AvailableThe project consists of Rehabilitation and improvements associated with #6 Pump Facility. Project work consists of the following: addition/expansion of the existing #6 Pump Facility building, modifications to the existing site and process piping, and removal/replacement of the vertical centrifugal pump and variable frequency drive.
Posted Date
Jan 24, 2026
Due Date
Feb 12, 2026
Release: Jan 24, 2026
Close: Feb 12, 2026
The project consists of Rehabilitation and improvements associated with #6 Pump Facility. Project work consists of the following: addition/expansion of the existing #6 Pump Facility building, modifications to the existing site and process piping, and removal/replacement of the vertical centrifugal pump and variable frequency drive.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →