Winfield Blvd Pedestrian Sidewalk and Bridge RFP
Construction of pedestrian sidewalk and bridge.
Description: Work includes 100 CY unclassified excavation, 10,000 LF temporary silt fence, 500 LF temporary fiber log, 3,333 SY solid slab sodding, 29 ton traffic bound surface course type e, 149 ton superpave, type s4(pg 64-22 ok), 593 SY cold milling pavement. See attached file.
StateAgency · OK, US
Adjacent opportunities open for bidding right now.
CityFL
Posted
Oct 15, 2026
Dec 8, 2026
Construction of pedestrian sidewalk and bridge.
CityCA
Posted
Nov 5, 2026
Dec 21, 2026
Work includes installation of sidewalks, as well as new driveway approaches, new curb ramps, large tree removals, mailbox relocation, removal of landscaping, adjustment of property elevations, etc.
CityTX
Posted
Nov 20, 2026
Dec 17, 2026
Project consists of concrete sidewalk, concrete curb ramps, concrete driveways, curb and gutter, pavement repair, small roadside aluminum signs, pavement striping, street lighting and all related appurtenances.
Oklahoma Department of Transportation
State AgencyOK
Posted
-
Jan 21, 2027
Work includes 66 LF temporary fiber log, 9 CY class a concrete, 640 lb epoxy coated reinforcing steel, 1,481 LF 2'-8" comb. Crb. & gut. (8" barrier), 876 SY 4" concrete sidewalk, 404 SY 6" concrete driveway (h. E. S. ), 158 SY (pl) stamped concrete finish, 2 EA manholes adjust to grade, 1,209 LF removal of curb and gutter, 358 SY removal of concrete pavement, 257 SY removal of asphalt pavement, 882 SY removal of sidewalk. See attached file.
Decision makers connected to this RFP from Oklahoma Department of Transportation.
Solicitation files and supporting documents for this bid.