Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Requirement is to remove the damaged flooring sections from crack to crack in the affected areas of SPS flooring areas (See Pictures). The site would need to be prepped for the remaining concrete slabs for reinstallation of affected areas. Use a leveling compound to correct the imperfections and blend color (gray shade) into existing floor color (can be determined in site visit). Then apply two-part epoxy floor covering that will hold up to moisture and chemical spills. Cove inch should be 6-inches in height. Approximate 150 square footage of affected areas throughout the room, not including tying in the repair work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Stamford is soliciting qualifications from architectural and engineering firms to design, engineer, and provide construction administration for a flooring replacement project at Northeast Elementary School. The procurement is a Request for Qualifications (Architecture/Engineering) with an estimated budget of approximately $500,000$2,000,000 and includes a pre-bid meeting scheduled for 2026-01-12. The solicitation opened 2025-12-11 and closes 2026-01-29, and is not a grant (it is a city procurement for professional services).
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
The City of Stamford is soliciting qualifications from architectural and engineering firms to design, engineer, and provide construction administration for a flooring replacement project at Northeast Elementary School. The procurement is a Request for Qualifications (Architecture/Engineering) with an estimated budget of approximately $500,000$2,000,000 and includes a pre-bid meeting scheduled for 2026-01-12. The solicitation opened 2025-12-11 and closes 2026-01-29, and is not a grant (it is a city procurement for professional services).
AvailableInstallation of approx. 4,000 LF of new 4" high-density polyethylene (HDPE) force main (FM) and approx. 900 LF of new 6" HDPE FM. The proposed pipe alignment begins at the Shoreham Beach I Sewage Pumping Station (SPS), traverses along Dogwood Trail, Cedar Lane and Shoreham Beach Road before terminating in a new precast concrete manhole located along Shoreham Beach Road on the Triton Beach SPS property. In addition to the pipe installation, this work will include connecting the existing 6" force main from Shoreham Beach II SPS to the new force main, new combination air release and vacuum relief valves housed in vaults, new dewatering valve housed in a vault, and new isolation valves along the FM.
Posted Date
Jan 5, 2026
Due Date
Feb 10, 2026
Release: Jan 5, 2026
Close: Feb 10, 2026
Installation of approx. 4,000 LF of new 4" high-density polyethylene (HDPE) force main (FM) and approx. 900 LF of new 6" HDPE FM. The proposed pipe alignment begins at the Shoreham Beach I Sewage Pumping Station (SPS), traverses along Dogwood Trail, Cedar Lane and Shoreham Beach Road before terminating in a new precast concrete manhole located along Shoreham Beach Road on the Triton Beach SPS property. In addition to the pipe installation, this work will include connecting the existing 6" force main from Shoreham Beach II SPS to the new force main, new combination air release and vacuum relief valves housed in vaults, new dewatering valve housed in a vault, and new isolation valves along the FM.
Repair SPS Deficiencies. The scope of this project requires construction work to repair the deficiencies within the SPS area to fulfill the requirements of ISO 9001:2015 (standards for Quality Management Systems), VA Directive VHA-1116(2) and VA Design Guide PG-18-12 285 Sterile Processing Service.
Posted Date
Dec 18, 2025
Due Date
Jan 30, 2026
Release: Dec 18, 2025
Close: Jan 30, 2026
Repair SPS Deficiencies. The scope of this project requires construction work to repair the deficiencies within the SPS area to fulfill the requirements of ISO 9001:2015 (standards for Quality Management Systems), VA Directive VHA-1116(2) and VA Design Guide PG-18-12 285 Sterile Processing Service.
AvailableProviding SPS STERIS products: The prospective contractor must be Brand Name or Equal to STERIS. V-PRO maX 2 Low Temperature Sterilizer. The sterilizer must have overall sterilizer dimensions as follows: Cabinet (DD): 33 x 72 x 40-15/16" (838 x 1829 x 1040 mm) Recessed/Cabinet (SD): 33 x 72 x 38-5/16" (838 x 1829 x 973 mm) Chamber: 17 x 15 x 32-1/2" (432 x 381 x 826 mm) with 4.8 cubic feet (136 L) of volume The sterilizer must not have special utility requirements for plumbing, ventilation, or air supply.
Posted Date
Jan 8, 2026
Due Date
Jan 15, 2026
Release: Jan 8, 2026
Close: Jan 15, 2026
Providing SPS STERIS products: The prospective contractor must be Brand Name or Equal to STERIS. V-PRO maX 2 Low Temperature Sterilizer. The sterilizer must have overall sterilizer dimensions as follows: Cabinet (DD): 33 x 72 x 40-15/16" (838 x 1829 x 1040 mm) Recessed/Cabinet (SD): 33 x 72 x 38-5/16" (838 x 1829 x 973 mm) Chamber: 17 x 15 x 32-1/2" (432 x 381 x 826 mm) with 4.8 cubic feet (136 L) of volume The sterilizer must not have special utility requirements for plumbing, ventilation, or air supply.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis