Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approx. 7,600 LF of 12" PVC force main, 500 LF of 12" HDPE force main, three (3) air release valves, and other associated appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes approx. 735 LF 30" Diameter PVC Force Main-Restrained; 559 LF 30" Diameter PVC Force Main-Unrestrained;1 EA 30" Line Stop; 200 YD Foundation Stabilization; 1 EA 30" gate valve; See Outside link
Posted Date
Dec 2, 2025
Due Date
Feb 3, 2026
Release: Dec 2, 2025
Close: Feb 3, 2026
Project includes approx. 735 LF 30" Diameter PVC Force Main-Restrained; 559 LF 30" Diameter PVC Force Main-Unrestrained;1 EA 30" Line Stop; 200 YD Foundation Stabilization; 1 EA 30" gate valve; See Outside link
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the relocation of the force main; associated site work and restoration; installation of E&S controls; and associated work
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Close: Jan 14, 2026
Replacement of the relocation of the force main; associated site work and restoration; installation of E&S controls; and associated work
AvailableWork consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Work consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
AvailableWork consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Work consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →