Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Las Vegas Valley Water District issued an Invitation for Bid for the Well 124 Equipping project, covering civil, structural, mechanical, and electrical installations including site grading, new fencing, concrete curb and gutter, pump and equipment pads, pipelines, valves, and electrical/communication systems. The engineer's estimate is $1,516,900 and the place of performance is 1001 S. Valley View Blvd, Las Vegas, NV (Las Vegas Springs Preserve area). The solicitation was posted on 2025-12-18 and the bid deadline is 2026-01-13; attachments are listed but require login to view.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of civil, structural, mechanical, and electrical installations for the equipping of a well as depicted in the Drawings and Specifications. The civil work includes, but is not limited to, site grading, placement of a aggregate base, the installation of a new decorative iron fence, access gates, a new concrete curb and gutter, and removal of existing landscaping. The structural work includes, but is not limited to, a new CMU wall section, pipe supports, a pump foundation pad, equipment pads, and replacement of an existing energy dissipater structure. The mechanical work includes, but is not limited to, the procurement and installation of well discharge and waste pipelines, valves, fittings, a tapping saddle at an existing water main, and appurtenances. The electrical work includes, but is not limited to, the installation of an Owner provided motor control center (MCC), Owner provided transformer, Owner provided control and communications cabinets, procurement and installation of conduit, pull boxes, power cabling, fiber optic cables, electrical termination to new equipment, and electrical terminations at Owner’s existing equipment.
Posted Date
Oct 1, 2025
Due Date
Jan 13, 2026
Release: Oct 1, 2025
Close: Jan 13, 2026
The work consists of civil, structural, mechanical, and electrical installations for the equipping of a well as depicted in the Drawings and Specifications. The civil work includes, but is not limited to, site grading, placement of a aggregate base, the installation of a new decorative iron fence, access gates, a new concrete curb and gutter, and removal of existing landscaping. The structural work includes, but is not limited to, a new CMU wall section, pipe supports, a pump foundation pad, equipment pads, and replacement of an existing energy dissipater structure. The mechanical work includes, but is not limited to, the procurement and installation of well discharge and waste pipelines, valves, fittings, a tapping saddle at an existing water main, and appurtenances. The electrical work includes, but is not limited to, the installation of an Owner provided motor control center (MCC), Owner provided transformer, Owner provided control and communications cabinets, procurement and installation of conduit, pull boxes, power cabling, fiber optic cables, electrical termination to new equipment, and electrical terminations at Owner’s existing equipment.
AvailableConstruction of aquifer storage and recovery (ASR) well injection equipping improvements, including utility connections, piping, wellhead construction, chemical treatment systems, electrical/instrumentation, commissioning, and 12 months of post-completion well backflushing, testing, and water quality sampling.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Construction of aquifer storage and recovery (ASR) well injection equipping improvements, including utility connections, piping, wellhead construction, chemical treatment systems, electrical/instrumentation, commissioning, and 12 months of post-completion well backflushing, testing, and water quality sampling.
AvailableWork includes furnishing and installing 280' of 14" dia highstrength low-alloy (hsla) schedule 40 column pipe and appurtenances, and column check valve; conduct well disinfection and water quality analysis; construct hot tap connection to the existing well connection main; 40 LF of 12" dip mortar lined and coated pipeline; 12' high cmu wall; testing existing fiber optic cable; 1,100 SF of 12" dip mortar lined and coated pipeline. See attached files.
Posted Date
Dec 23, 2025
Due Date
Jan 23, 2026
Release: Dec 23, 2025
Close: Jan 23, 2026
Work includes furnishing and installing 280' of 14" dia highstrength low-alloy (hsla) schedule 40 column pipe and appurtenances, and column check valve; conduct well disinfection and water quality analysis; construct hot tap connection to the existing well connection main; 40 LF of 12" dip mortar lined and coated pipeline; 12' high cmu wall; testing existing fiber optic cable; 1,100 SF of 12" dip mortar lined and coated pipeline. See attached files.
Rehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Rehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →