Retrieving RFP details
Release
Close
City of Pleasant Hill
The project consists of replacing an existing aggregate surfaced parking lot with an asphalt surfaced parking lot including grading and pavement striping. Also includes 1 LS of unclassified excavation and existing materials removal/disposal; 130 LF of saw cut and pavement removal (driveway); 2,600 SY of existing gravel parking lot to be removed; see outside link.
2ndStreetParkingLotImprovementsbid3691331092925-080128AMa
Chicago-Gary Regional Airport Authority
Work include passenger boarding bridges and parking lot improvements.
City of Bentonville
Work consists of Stormwater improvements that will divert the drainage from a culvert under SW 2nd street to a proposed storm sewer system which will run parallel to SW 2nd (HWY72). The work is expected to include but not be limited to excavation, sodding, erosion control, tree protection, temporary traffic control, and mobilization required.
Mill Creek Metropolitan Park District
Park Improvements Construction of Aggregate Parking Lot & Trails.
Release
Sep 29, 2025
Close
Oct 29, 2025