School DistrictMI
Jul 12, 2026
Closes
Aug 11, 2026
SB-0066 New Sheridan Rd School Construction
Work include school road construction.
Description: Bi-State Development is soliciting construction bids for improvements at community mobility hub locations, including sidewalk replacement, excavation, wheelchair-ramp pads, bus shelter pads, and site restoration. This is a construction procurement rather than a grant program. The opportunity was posted on August 4, 2026, and responses are due August 27, 2026, through the agency’s online bidding system.
SpecialDistrict · MO, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Bi-State Development Agency.
Adjacent opportunities open for bidding right now.
School DistrictMI
Jul 12, 2026
Closes
Aug 11, 2026
Work include school road construction.
CountyCO
Aug 5, 2026
Closes
Sep 2, 2026
Adams County is soliciting proposals from a qualified contractor to develop and implement a solar-powered e-transportation and power hubs (E-Hubs) program in the county. The work includes E-Hub design and implementation support, public outreach and marketing, operations and maintenance, performance monitoring, and monthly and quarterly reporting. Proposals are due September 2, 2026, at 4:00 p.m. MDT, and the posting describes a vendor service procurement rather than a grant application.
CityGA
Jul 22, 2026
Closes
Aug 17, 2026
The City of Albany, Georgia is soliciting bids for ITB 27-006, 'Speed Table Construction'. This project involves the construction of speed tables. Bids are due by August 17, 2026.
CityGA
Aug 3, 2026
Closes
Sep 16, 2026
Replace an existing 8" high pressure plug valve with a new 8" welded, maintenance-free ball valve. The project requires installing the new valve while maintaining system integrity by performing hot tapping and stopping operations. 6' x 40' quadrupole detection loop, the detection loop will be replaced within three days after the pavement work is complete. Utility coordination and Georgia 811 notification prior to excavation. Traffic control. Saw cutting, excavation, trench safety, dewatering, and restoration of the work area. Installation of city-furnished 8" control fittings, piping, valve and associated appurtenances. Fabrication and welding of the replacement valve assembly. Pressure testing of the completed installation. Removal and abandonment of the existing valve. Leak testing, coating/wrapping of exposed steel piping and fittings, and installation of the new valve box. Backfilling, compaction, and restoration of the roadway. Disposal of all waste materials generated during construction.