Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 258.3 SY deck overlay (class HPC-O PCC); 258.3 SY fiber reinforcement for concrete repair/overlay; 412.4 SY paved shoulder, hot mix asphalt mixture, 9"; 612.8 SY shoulder strengthening, optional hot mix asphalt mixture or portland cement concrete 8"; 12,220 STA shoulder construction, earth; 669.3 SY longitudinal grooving in concrete, bridge deck; 100 LF steel beam guardrail; 595 LF silt fence; 662.5 LF perimeter and slope sediment control device, 12" dia.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 878 LB reinforcing steel, epoxy coated; 150 SY deck repair, class A; 5 SY deck repair, class B; 160 SF concrete repair; 95 LF paving notch replacement; 689 SY deck overlay (class HPC-O PCC); 680 SY longitudinal grooving in concrete, bridge deck; 125 LF steel beam guardrail; 2 EA. steel beam guardrail barrier transition section, BA-201; 713 SY longitudinal grooving in concrete pavement; 541 LF silt fence; 315 SY deck repair, class A; 5 SY deck repair class B.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Work includes 878 LB reinforcing steel, epoxy coated; 150 SY deck repair, class A; 5 SY deck repair, class B; 160 SF concrete repair; 95 LF paving notch replacement; 689 SY deck overlay (class HPC-O PCC); 680 SY longitudinal grooving in concrete, bridge deck; 125 LF steel beam guardrail; 2 EA. steel beam guardrail barrier transition section, BA-201; 713 SY longitudinal grooving in concrete pavement; 541 LF silt fence; 315 SY deck repair, class A; 5 SY deck repair class B.
AvailableBridge deck overlay.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Bridge deck overlay.
AvailableBridge deck overlay and other repairs.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Bridge deck overlay and other repairs.
AvailableWork includes 460' bridge deck overlay (SN 016-0634) consist of joint replacement, substructure repairs and cleaning and painting of bearings of the bridge.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Work includes 460' bridge deck overlay (SN 016-0634) consist of joint replacement, substructure repairs and cleaning and painting of bearings of the bridge.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis