Special DistrictAL
Posted
Oct 30, 2026
Nov 17, 2026
Mitchell Water System Liberty Tank Repaint Project RFP
Work consist of exterior and interior blasting and painting of the liberty 300,000-gallon ground water storage tank.
Description: Mechanical project.
SchoolDistrict · IL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Bourbonnais Elementary School District 53.
Adjacent opportunities open for bidding right now.
Special DistrictAL
Posted
Oct 30, 2026
Nov 17, 2026
Work consist of exterior and interior blasting and painting of the liberty 300,000-gallon ground water storage tank.
State AgencyNV
Posted
Oct 29, 2026
Nov 30, 2026
Mechanical hazardous fuels reduction treatment across approximately 60 acres in Virginia City Highlands, Storey County, Nevada.
FederalVA
Posted
Nov 5, 2026
Dec 21, 2026
Provide actuator, elect-mechanical, NSN 7R-1680-015979798-RQ, REF NR 3671200C01101-303, QTY 7 Ea
Posted
Oct 14, 2026
Nov 17, 2026
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the comprehensive maintenance and services for the installation and maintenance of the mechanical systems in the Pentagon Reservation and Mark Center except for those items specified as government-furnished. The Contractor shall perform all services to meet the standards set forth in this contract. At a high level, the core services to be provided include: Mechanical Infrastructure Installation: Commercial mechanical infrastructure installation may include the full build out of a building's HVAC, plumbing, and process piping systems, including installing central plant equipment such as chillers, boilers, cooling towers, and associated pumps; running piping for chilled water, heating hot water, steam, condensate, domestic hot water, drinking water, and sanitary/storm drainage systems; installing air handling units (AHUs), fan coil units (FCUs), terminal units, exhaust fans, and ductwork; setting up pumps, heat exchangers, expansion tanks, air separators, pressure reducing valves, backflow preventers, and other ancillary equipment; providing proper pipe supports, hangers, seismic bracing, and vibration isolation; ensuring all grounding, bonding, insulation, and safety measures meet applicable codes including the Washington Headquarters Services Building Code (WHSBC), Unified Facilities Criteria (UFC), Unified Facilities Guide Specifications (UFGS), and Pentagon Facilities Guide Specifications (PFGS); and completing hydrostatic testing, flushing, chemical treatment, testing, adjusting, and balancing (TAB), inspection, and commissioning to verify safe, reliable operation. See attached file.