Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1 LS earthwork, 400 SY solid slab sodding, 300 CY aggregate base type A, 120,000 CY (SP) hot-in-place recycled asph concrete, 3,000 SY cold milling pavement, 87,000 LF rumble strip-method HMA-con, 500 LF sawing pavement, 108,000 LF (SP) traffic stripe (Plural-component) 6" wide.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Resurface (asphalt). Work includes construction signs; 28,980 LF of 4" traffic stripe; 1,027 LF of 8" traffic stripe; 497 LF of 12" traffic stripe. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Resurface (asphalt). Work includes construction signs; 28,980 LF of 4" traffic stripe; 1,027 LF of 8" traffic stripe; 497 LF of 12" traffic stripe. See attached file.
AvailableResurface (asphalt). Work includes 1,819 CY of unclassified borrow; 128,036 LF of machine grading; 128 Ton traffic bound surface course type E; 1,423 Gal fog seal; 8,083 Ton type S4 superpave; 6,024 Ton type 55 superpave; 72,148 SY of cold milling pavement; 64,060 LF of 4" wide traffic stripe. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Resurface (asphalt). Work includes 1,819 CY of unclassified borrow; 128,036 LF of machine grading; 128 Ton traffic bound surface course type E; 1,423 Gal fog seal; 8,083 Ton type S4 superpave; 6,024 Ton type 55 superpave; 72,148 SY of cold milling pavement; 64,060 LF of 4" wide traffic stripe. See attached file.
AvailableResurface (asphalt).
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
Resurface (asphalt).
Available6,350 LF machine grading, 100 gal fog seal, 1,900 LF (PL) crack sealing asphalt pavement, 3,275 ton superpave, type S4 (PG 70-28 OK)m 29,125 SY cold milling pavement, 11,620 LF rumble strip-method HMA-con.
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Close: Jan 15, 2026
6,350 LF machine grading, 100 gal fog seal, 1,900 LF (PL) crack sealing asphalt pavement, 3,275 ton superpave, type S4 (PG 70-28 OK)m 29,125 SY cold milling pavement, 11,620 LF rumble strip-method HMA-con.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis