Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
6,350 LF machine grading, 100 gal fog seal, 1,900 LF (PL) crack sealing asphalt pavement, 3,275 ton superpave, type S4 (PG 70-28 OK)m 29,125 SY cold milling pavement, 11,620 LF rumble strip-method HMA-con.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Resurface (asphalt).
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
Resurface (asphalt).
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Resurface (asphalt). Work includes 1,819 CY of unclassified borrow; 128,036 LF of machine grading; 128 Ton traffic bound surface course type E; 1,423 Gal fog seal; 8,083 Ton type S4 superpave; 6,024 Ton type 55 superpave; 72,148 SY of cold milling pavement; 64,060 LF of 4" wide traffic stripe. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Resurface (asphalt). Work includes 1,819 CY of unclassified borrow; 128,036 LF of machine grading; 128 Ton traffic bound surface course type E; 1,423 Gal fog seal; 8,083 Ton type S4 superpave; 6,024 Ton type 55 superpave; 72,148 SY of cold milling pavement; 64,060 LF of 4" wide traffic stripe. See attached file.
Available11,827 gal tack coat, 13,916 ton superpave type S4 (PG 76-28 OK), 157,696 SY cold milling pavement, 1,560 SD construction signs 0 to 6.25 SF. See attached file.
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Close: Jan 15, 2026
11,827 gal tack coat, 13,916 ton superpave type S4 (PG 76-28 OK), 157,696 SY cold milling pavement, 1,560 SD construction signs 0 to 6.25 SF. See attached file.
AvailableIDOT Region 5, District 9 is soliciting bids for 6.8 miles of resurfacing and ADA ramp improvements along US 51 in Perry County, from 0.2 miles north of IL 154 to Raven Road. The contract duration is 50 working days and is part of the January 16, 2026 letting scheduled for 12:00 PM. Plans and Special Provisions have not yet been posted; the project was previously advertised on November 7, 2025.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
IDOT Region 5, District 9 is soliciting bids for 6.8 miles of resurfacing and ADA ramp improvements along US 51 in Perry County, from 0.2 miles north of IL 154 to Raven Road. The contract duration is 50 working days and is part of the January 16, 2026 letting scheduled for 12:00 PM. Plans and Special Provisions have not yet been posted; the project was previously advertised on November 7, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →