Las Vegas Valley Water District
Special DistrictNV
Posted
Oct 27, 2026
Nov 18, 2026
Resilient Seated Gate Valves (Invitation for Bid)
Purchase of 20" resilient seated gate valves.
Description: Purchase of resilient-seated gate and tapping valves, and reduced-wall resilient-seated gate and tapping valves for water supply services on an as needed basis as requested by system.
SpecialDistrict · TX, US
Adjacent opportunities open for bidding right now.
Las Vegas Valley Water District
Special DistrictNV
Posted
Oct 27, 2026
Nov 18, 2026
Purchase of 20" resilient seated gate valves.
Colorado River Municipal Water District
Special DistrictTX
Posted
Nov 2, 2026
Nov 19, 2026
Purchase of 54" gate valve with bypass.
CityTX
Posted
Oct 16, 2026
Nov 11, 2026
Work includes as-needed maintenance, repair, rehabilitation, and replacement of City-owned screening walls and related structures at various locations throughout the City. Work may include brick and masonry walls, prefabricated concrete panels, columns, pilasters, retaining walls, steps, foundations, wall caps, angle-iron supports, structural connections, and associated components.
FederalDC
Posted
Oct 30, 2026
Nov 16, 2026
6 ea, valve, 4" IPS, gate, bronze body, Nickel alloy trim, comm. Flanged, 150 PSI, 225 PSI w.O.G., 9" face to face, 9" od flange, 8 hole, 7 1/2" bolt circle, rising stem, bolted bonnet, NSN: 4820 00-463-2191, cage code / P/N: 76364 / 1306; 30263 / b102e; 3b558 / b102e; 1 ea, valve, 2 1/2" IPS, check, swing, bronze body, monel trim, commercial flanged, 150lb, NSN: 4820 00-148-4864 CAGE CODE / P/N: 81349 / MILV18439; 30263 / b1620-0250norev/cid882039626; 6r256 / b1620-0250norev/cid882039626; 2 ea, valve, 1", bronze, uesb, 100-200 PSI adjustable range, trac style hg, mil-V-2961 ty 1, cl 1, body a, series 400, gas pressure reducing valve, monel trim, buna-n disc & diaphragm, NSN: 4820 01-LG1-7418, cage code / P/N: 7D409 / 40496-305; 4jr65 / 40496-305; 0bgu9 / 40496-305. See outside link.
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
591 days before RFP
The agenda proposed awarding construction for the Indian Hills Elevated Storage Tank project, including booster-station upgrades and replacement of valves and meters.
SUBJECT: AWARD OF CONSTRUCTION CONTRACT IN CONNECTION WITH THE INDIAN HILLS ELEVATED STORAGE TANK PROJECT Board Action Date: March 11, 2025 SUMMARY AND RECOMMENDATION: The attached resolution awards a construction contract to Landmark Structures I, LP, a non-local contractor, in an amount not to exceed $17,174,000.00 in connection with the Indian Hills…
San Antonio Water System Board Of Trustees Regular Board Meeting
Agenda packet · Mar 11, 2025
Budget
The FY2026 budget includes an annual project to replace water mains, valves, hydrants, and meters in the SAWS distribution system.
WATER DELIVERY PROJECTS The 2026 Budget includes funding for one specific water delivery project and three water delivery replacement categories that give staff flexibility to best address needs as they arise. Details about these projects can be found in the following descriptions and project data sheets. VALVES, SERVICES, AND METER REPLACEMENTS This annual…
San Antonio Water System FY2026 Budget
Budget · 2026
Board meeting
199 days before RFP
SAWS recorded $21.1 million in 2025 spending on its annual Water Delivery project to replace water mains, hydrants, valves, services and meters.
Major capital asset spending for the year ended December 31, 2025, included the following projects: ConnectH2O Advanced Metering Infrastructure (AMI) -- This project consisted of the full system- wide deployment of more than 604,000 AMI water meters. Customers now have access to their hourly water usage online and can receive continuous water usage…
Agenda packet
17 days before RFP
SAWS's proposed FY2027 CIP included $93.2 million for water-delivery upgrades, infrastructure replacements, and new water-main extensions.
2027 Capital Improvement Program The Capital Improvement Program (CIP) consists of capital improvement projects focused on sustaining, restoring and modernizing SAWS facilities and infrastructure. The 2027 CIP totals $566.9 million and is comprised of: • $17.0 million in Water Supply projects. • $93.2 million in Water Delivery projects for production…
San Antonio Water System Board of Trustees Regular Board Meeting
Agenda packet · Oct 6, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (6 days left)
Distribution & Collection Operations -- Water and Sewer Main Replacement -- Valves, Services and Meter Replacement -- Sewer Laterals
Capital Improvement Program 2026
Strategic plan · Jan 21, 2026
San Antonio Water System Board Of Trustees Board Meeting
Board meeting · Apr 7, 2026
Valves, Services and Meter Replacements Construction 22,075,000
San Antonio Water System Annual Operating Budget
Board meeting · Nov 5, 2024
Decision makers connected to this RFP from San Antonio Water System.