25132-210086 - 5.07 mi of road reconstruction, grading, drainage, watermain and storm sewer replacement, noise wall replacement, guardrail, concrete sidewalk, ramps, curb and gutter, traffic signals, signing, ITS, lighting, pavement markings, reconstruction of 8 structures, rehabilitation of 20 structures, 1 deck park conversion, removal of 8 structures, and approach work on I-475 from Thread Creek to Flint River in the cities of Flint and Burton, Genesee County. RFP
Description: 5.07 mi of road reconstruction, grading, drainage, watermain and storm sewer replacement, noise wall replacement, guardrail, concrete sidewalk, ramps, curb and gutter, traffic signals, signing, ITS, lighting, pavement markings, reconstruction of 8 structures, rehabilitation of 20 structures, 1 deck park conversion, removal of 8 structures, and approach work on I-475 from Thread Creek to Flint River in the cities of Flint and Burton, Genesee County. This project is an Alternate Pavement Bid Project. Alternate 1 (Section 2) is an Hot Mix Asphalt Alternative and includes a 5 year materials and workmanship pavement warranty. Alternate 2 (Section 3) is a Concrete Alternative and includes a 5 year materials and workmanship pavement warranty. This project also includes a 5 year epoxy overlay performance warranty, a 2 year bridge coating warranty, and a 2 year concrete surface coating warranty. Required DBE Participation: 0.00% Required SBP Participation: 5.00% Net Classification Required For This Project: ** 225052 Ea or 225052 Fa ** Completion Date: 9/19/2030 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
2.21 mi of concrete roadway reconstruction, water main, drainage work, guardrail, traffic signals, signing and bridge reconstruction and rehabilitation on several structures and pavement markings.
2.21 mi of concrete roadway reconstruction, water main, drainage work, guardrail, traffic signals, signing and bridge reconstruction and rehabilitation on several structures and pavement markings on US-127 from Red Cedar to south of Lake Lansing Road in the cities of Lansing and East Lansing, Ingham County. This project contains two 5 year materials and workmanship pavement warranties, a 2 year concrete surface coating warranty, a 2 year bridge coating warranty, and a 5 year epoxy performance warranty. Required DBE Participation: 0.00% Required SBP Participation: 5.00% Net Classification Required For This Project: ** 124761 Fa ** Completion Date: 9/30/2029 12:00:00 AM
0.41 mi of hot mix asphalt reconstruction including a roundabout, storm sewer, culvert, concrete curb and gutter, sidewalk, shared-use path, signing, guardrail and pavement markings on M-59 at Latson Road, Livingston County. This project includes a 5 year materials and workmanship pavement warranty. Required DBE Participation: 2.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 5290 Ea ** Completion Date: 11/15/2029 12:00:00 AM
RFP documents
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.