State AgencyAL
Posted
Oct 2, 2026
Nov 30, 2026
430-740119/Lift Inspection/ Auburn RFP
Provide annual lift inspection (1) lift.
Description: ADVERTISEMENT FOR BID Sealed proposals will be received from pre-qualified bidders by Ms. Jenna Morgan on behalf of Dr. Christopher B. Roberts, President of Auburn University at 1161 West Samford Avenue, Auburn University, AL 36849 until 3:00 PM Central Time, January 14, 2027 for: 25-430 College of Education Bldg - Basement Fit-out For Agriscience AUBURN UNIVERSITY at which time and place they will be publicly opened and read in Facilities Management Building One, Training Room A. SCOPE OF WORK: The general scope of the work includes but is not limited to: Build-out of the College of Education Building storm shelter into a workshop for the Agriscience Program. The space is designed to support woodworking, metalworking, and welding, and it will also include office and storage space. The Pre-Bid Conference will be held on December 15, 2026 at 10:00 A.M. CST at the College of Education Building-Storm Shelter, 345 W Samford Ave, Auburn, AL 36849. In accordance with Code of Alabama, 39-2-2(a), prequalification is required for this project. The prequalification application is available on the Auburn University Public Works Bid Calendar (Auburn University Facilities Management website). For all questions or inquiries about this project, please contact: Josh Lane, jbl0007@auburn.edu; (334) 703-0214. DOCUMENTS: Drawings may be examined at the following locations: Drawings and specifications may be examined at the Office of the Owner: Planning, Design & Construction, Facilities Management, Auburn University, AL. Auburn University Facilities Management Website. BONDS: A certified check or bid bond payable to Auburn University in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00, must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. BIDS: Bids must be submitted on proposal forms or copies thereof furnished by the Architect. Dr. Christopher B. Roberts, President Auburn University Auburn University, AL 36849 END. Dates of Advertisement: Opelika-Auburn News: November 28, 2026; December 5, 2026; December 12, 2026.
HigherEducation · AL, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Auburn University.
Adjacent opportunities open for bidding right now.
State AgencyAL
Posted
Oct 2, 2026
Nov 30, 2026
Provide annual lift inspection (1) lift.
State AgencyMA
Posted
Nov 11, 2026
Dec 16, 2026
Interior renovation of tenant space within fish pier east. Final product to be a lab/office space spanning two floors, including elevator on exterior.
Washington State Department of Natural Resources
State AgencyWA
Posted
-
Jun 8, 2027
Sealed-bid, lump-sum sale of approximately 4,948 MBF of timber in King County, Washington.
School DistrictFL
Posted
Nov 16, 2026
Dec 10, 2026
Renovation of the restrooms in Building 5 at Lakeside Junior High School.