Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approox 2,265 LF fiber rolls 12"; 1,678 LF remove fiber rolls 12"; 156 mhr flagging; 709 unit traffic control signs; 38 ea delineator drums; 16 ea tubular markers; 2 ea temporary connection; 2 ea removal of temp connection; 540 LF sppa culvert liner; 1 l sum fence remove & reset; 4,182 SY flexible growth medium. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide Cured-in-Place Pipe (CIPP) rehabilitation services for the City's stormwater drainage system on an on-call basis. This contract will be used to address both currently identified locations requiring stormwater pipe rehabilitation as well as additional sites that may be discovered through ongoing inspections or emergent needs. The intent of this Request for Proposal (RFP) is to establish a one-time contract with a qualified contractor who can perform CIPP lining, cleaning, CCTV inspections, and all associated rehabilitation activities on an as-needed basis until all allocated funds have been expended. Work under this contract shall include stormwater pipes of various sizes, materials, and conditions throughout the City. The work includes, but is not limited to: Cleaning stormwater pipes using jet/vac equipment. CCTV inspection and documentation. CIPP lining of storm drain pipes of various sizes, materials, and conditions.
Posted Date
Jan 9, 2026
Due Date
Feb 24, 2026
Release: Jan 9, 2026
Close: Feb 24, 2026
Provide Cured-in-Place Pipe (CIPP) rehabilitation services for the City's stormwater drainage system on an on-call basis. This contract will be used to address both currently identified locations requiring stormwater pipe rehabilitation as well as additional sites that may be discovered through ongoing inspections or emergent needs. The intent of this Request for Proposal (RFP) is to establish a one-time contract with a qualified contractor who can perform CIPP lining, cleaning, CCTV inspections, and all associated rehabilitation activities on an as-needed basis until all allocated funds have been expended. Work under this contract shall include stormwater pipes of various sizes, materials, and conditions throughout the City. The work includes, but is not limited to: Cleaning stormwater pipes using jet/vac equipment. CCTV inspection and documentation. CIPP lining of storm drain pipes of various sizes, materials, and conditions.
AvailablePerform cured-in-place pipe (CIPP) lining of the specified storm, sanitary, and combined sewers.
Posted Date
Jan 12, 2026
Due Date
Jan 26, 2026
Release: Jan 12, 2026
Close: Jan 26, 2026
Perform cured-in-place pipe (CIPP) lining of the specified storm, sanitary, and combined sewers.
AvailableRelease: Jan 12, 2026
Close: Feb 24, 2026
Provide system lining.
Available1.Inspect the area regarding culvert replacement and removal. 2. Develop a detailed cost estimate. 3. Removal off existing culvert. 4. Replacement of culvert: a. Must be buried two feet in the ground b. Stone inside culvert c. Stone headwalls inlet and outlet d. Stone work sizing noted in the specifications.
Posted Date
Dec 29, 2025
Due Date
Feb 5, 2026
Release: Dec 29, 2025
Close: Feb 5, 2026
1.Inspect the area regarding culvert replacement and removal. 2. Develop a detailed cost estimate. 3. Removal off existing culvert. 4. Replacement of culvert: a. Must be buried two feet in the ground b. Stone inside culvert c. Stone headwalls inlet and outlet d. Stone work sizing noted in the specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis