Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Providing replacement cartridges for the three (3) existing pall water hollow fiber package skid membranes (AP-6), two (2) new AP-6 skids and all necessary appurtenances and ancillary equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consist of iron filter replacement in water treatment plant. 1 LS WTP & well improvements; 1 LS filter improvements; 1 LS backwash waste tank rehabilitation; 1 LS owner's allowance.
Posted Date
Oct 30, 2025
Due Date
Dec 16, 2025
Release: Oct 30, 2025
Close: Dec 16, 2025
Project consist of iron filter replacement in water treatment plant. 1 LS WTP & well improvements; 1 LS filter improvements; 1 LS backwash waste tank rehabilitation; 1 LS owner's allowance.
AvailablePremium
Access the largest public sector contact database
Provide water treatment plant improvements, pre-filter screen replacement project includes replacement three (3) self cleaning pre-filter screens and associated valving, electrical and SCADA improvements.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Provide water treatment plant improvements, pre-filter screen replacement project includes replacement three (3) self cleaning pre-filter screens and associated valving, electrical and SCADA improvements.
AvailableWork consists of, but not limited to, the rehabilitation of the existing filtration system by replacing the filter underdrain, filter media, launder troughs, air scour delivery system within the underdrain, providing new positive displacement air scour blowers, placement of a crystalline coating system to address leaks in the concrete structure, and the addition of piping within the filter influent flume and other identified surfaces. New chemical injection points and piping will be provided at the clearwell.Other rehabilitation replacements include providing new valves and electric actuators to replace existing. The Human Machine Interface (HMI) on the existing filter control panel, electrical panels within the electrical room, turbidity instruments, filter box level indicators, and pressure head monitoring are to be replaced as well. Within the blower and electrical room, the doors shall be replaced and include landing pads to address existing drainage related sloping issues.
Posted Date
Oct 29, 2025
Due Date
Dec 15, 2025
Release: Oct 29, 2025
Close: Dec 15, 2025
Work consists of, but not limited to, the rehabilitation of the existing filtration system by replacing the filter underdrain, filter media, launder troughs, air scour delivery system within the underdrain, providing new positive displacement air scour blowers, placement of a crystalline coating system to address leaks in the concrete structure, and the addition of piping within the filter influent flume and other identified surfaces. New chemical injection points and piping will be provided at the clearwell.Other rehabilitation replacements include providing new valves and electric actuators to replace existing. The Human Machine Interface (HMI) on the existing filter control panel, electrical panels within the electrical room, turbidity instruments, filter box level indicators, and pressure head monitoring are to be replaced as well. Within the blower and electrical room, the doors shall be replaced and include landing pads to address existing drainage related sloping issues.
AvailableProvide water treatment plant emergency generator addition.
Posted Date
Dec 1, 2025
Due Date
Jan 20, 2026
Release: Dec 1, 2025
Close: Jan 20, 2026
Provide water treatment plant emergency generator addition.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis