Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide water treatment plant improvements, pre-filter screen replacement project includes replacement three (3) self cleaning pre-filter screens and associated valving, electrical and SCADA improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consist of iron filter replacement in water treatment plant. 1 LS WTP & well improvements; 1 LS filter improvements; 1 LS backwash waste tank rehabilitation; 1 LS owner's allowance.
Posted Date
Oct 30, 2025
Due Date
Dec 16, 2025
Release: Oct 30, 2025
Close: Dec 16, 2025
Project consist of iron filter replacement in water treatment plant. 1 LS WTP & well improvements; 1 LS filter improvements; 1 LS backwash waste tank rehabilitation; 1 LS owner's allowance.
AvailablePremium
Access the largest public sector contact database
Provide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
Posted Date
Dec 25, 2025
Due Date
Jan 23, 2026
Release: Dec 25, 2025
Close: Jan 23, 2026
Provide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
AvailableWork consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableThis project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
Posted Date
Nov 21, 2025
Due Date
Feb 4, 2026
Release: Nov 21, 2025
Close: Feb 4, 2026
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis